AMEND 0001 ADDED COVER PAGE
The Contractor shall provide all personnel, materials, labor, equipment and supervision to complete the shower renovation as per the Performance Work Statement (PWS) at the San Juan, PR Weather Forecast Office (WFO).
Work includes demolition of existing tile, fixtures, lighting, electrical, flooring and wood boards with disposal of all debris from Government property, installation of a seamless monolithic fluid-applied resinous flooring and wall system with DCOF of 0.42 and 125 mil thickness sloped to drain, replumbing the shower drain into the building sanitary sewer with 1/4 inch per foot slope and marine-grade hardware per Puerto Rico Plumbing and Building Codes, replacing lighting and switch with Wet Location IP65 or higher LED and GFCI as required per NEC 2023, plus project schedule, color samples, fixture cut sheets, plumbing drawings, warranties, O&M manuals and as-built drawings, completed within 90 days of notice to proceed.
We post new bathroom opportunities in Washington as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""US""98115""SEATTLE""WA""USA""WESTERN ACQUISITION DIVISION""7600 SAND POINT WAY NE BLDG 1,""Sol_1305M327Q0060_Amd_0001.pdf"306281"file"".pdf""1""2026-11-18T23:38:58.524+00:00""1bdf5de5225c4b6eb8ada968ef2c5bbd""public""0""public""27bc3bfb437945adacaa668a4551c484""0"4"0""Sol_1305M327Q0060.pdf"370547"file"".pdf""1""2026-11-18T23:35:55.115+00:00""b716787ed70a4b3d95414407e9b59a47""public""0""public""a43c756a10234dd390b83ff4cdf44121""0"3"0""Attachement_2_Davis_Bacon_Act_GD_PR20260001.pdf"52865"file"".pdf""1""2026-11-18T23:35:55.115+00:00""06ca06ccaf024e9ab46b6eadbb59c928""public""0""public""9a15c94bf0104a90bc8b4000c93d64dd""0"2"0""Attachment_1_Diagrams_Site_Photos.docx"7999247"file"".docx""1""2026-11-18T23:35:55.115+00:00""bcb401af9b9a49ac94176af9d80ad078""public""0""public""50434c6fc8ea4f30b0575e011bc54d9f""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice df67957d2ad141bab740522c09142065), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.