EDIT - 9 Sept 2026: Clauses for Payment and Performance Bonds have been removed from Attachment 4. This is a non-construction service applicable to the Service Contract Act.
EDIT: Amendment 0001 has been posted, which corrects the site visit date and PoP. Changes are in red.
The 126 Air Refueling Wing has a requirement to restore numerous plant beds across the campus to their original condition.
Please refer to the attached document titled "Combined Synopsis-Solicitation_W50S7S26Q0035" for full details regarding this requirement. The attached document contains the Requirement Description, Line Item Structure, Site Visit Instructions, Submission Instructions, Evaluation Factors, and all applicable RFO Provisions and Clauses (including specific quote submission instructions and evaluation factors).
Vendors must review the Combined Synopsis-Solicitation and all attachments in their entirety prior to submitting a quote.
The contractor shall remove approximately 1,664 LF of metal lining, 14,511 SF of decorative rock and underlying weed barrier from various planter beds at 126 ARW, Scott AFB, IL. The contractor shall install new heavy-duty non-woven geotextile weed barrier fabric, new commercial-grade steel planter bed liners, and re-deposit washed decorative rock supplemented with new matching rock to a uniform average depth of 3 inches. Work includes 18 CLINs covering specific building areas, a KC-135 Tail Display, Minute Man Memorial, and other locations. The contractor must retain existing landscaped plants, comply with all applicable UFC, NFPA, NEC and other regulations, and coordinate with 126 CES. The period of performance is 45 days (negotiable) from NTP.
We post new exterior maintenance opportunities in Illinois as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"62225-5503""SCOTT AFB""IL""USA""KO FOR ILANG DO NOT DELETE""2101 GOLF COURSE DR""Combined Synopsis-Solicitation_W50S7S26Q0035 0001.pdf"71991"file"".pdf""1""2026-09-05T16:56:43.787+00:00""2d58131e4d634c5bb4c76c854d3bebc1""public""0""public""4420884a5c4846ae84775042a9f589e5""0"20"0""Attachment 1 - Performance Work Statement.pdf"357437"file"".pdf""1""2026-09-04T21:54:16.104+00:00""77b86836d150471086fea5b99c1c1104""public""0""public""62a9b8828a0e4b078320933225b5eda6""0"12"0""Attachment 2 - 126 ARW Site Plan.pdf"3863227"file"".pdf""1""2026-09-04T21:51:14.426+00:00""e6e67bfb20f746f7a3cb44fa43d91b50""public""0""public""3cf6707e958e48dda058c6c4ae81b65e""0"10"0""Attachment 3 - SCA Wage Determination 2015-5075.pdf"44589"file"".pdf""1""2026-09-04T21:51:14.426+00:00""c41692cc6a504e5f869e20bdfffd312f""public""0""public""b16915f7c08b4c5e84bb2c7eee6a0e21""0"7"0""Attachment 4 - Clauses and Provisions.pdf"36016"file"".pdf""1""2026-09-04T21:51:14.426+00:00""3e82b8adfde24e918890f6a4b873727f""public""2026-09-09T14:10:42.333+00:00""1""public""4296da1a252b418b9d52cff30308fac7""0"6"0""2026-09-09T14:10:42.333+00:00""Attachment 4 - Clauses and Provisions_9 Sept 2026.pdf"36592"file"".pdf""1""2026-09-09T14:10:42.333+00:00""65f0559c55364de187f71da7c7950184""public""0""public""9a1875ce5b7942c8880fbceac13618fa""0"5"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: SAM.gov (notice de86b56c024442c082dea997f0bfe7b1), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.