The Cobb County Department of Transportation (Cobb DOT) hereby posts the following Notice of Intent to Advertise (NOIA) for considered services. Cobb DOT intends to solicit responses for Design Build Services for the Chattahoochee River Trail Project, Phase II, PI No. 0019617, Cobb DOT Project No. B2432.
Posted: September 10, 2026
Cobb County Department of
Transportation
Public Notice Advertisement
PE-77050-NONST-2027-000000105
To Provide
Design-Build Services for
The Chattahoochee River Trail Project, Phase II
P.I. Number: 0019617
Cobb DOT Project No. B2432
Cobb County, GA
Cobb Department of Transportation
1890 County Services Parkway
Marietta, Georgia 30008
PE-77050-NONST-2027-000000105 Page 2 of 5
Public Notice Advertisement
Design-Build Services
The Cobb County Department of Transportation (Cobb DOT) hereby posts the following Public Notice
Advertisement (PNA) for considered services. Cobb DOT intends to solicit responses for design and
construction services necessary to construct the Chattahoochee River Trail, Phase II, in Cobb County, GA.
Please review Section 3 (Tentative Schedule of Events) below to obtain solicitation information.
THIS IS A PUBLIC NOTICE ADVERTISEMENT ONLY. No document submittals are expected or required
from this PNA.
This project will follow the Georgia Department of Transportation’s (Georgia DOT’s) Design-Build process.
Information regarding Georgia DOT’s Design-Build process can be reviewed at the following website:
https://www.dot.ga.gov/GDOT/Pages/DesignBuild.aspx.
Method of Communication
All general communication of relevant information regarding this solicitation will be made via the Georgia
Procurement Registry (GPR) at https://ssl.doas.state.ga.us/gpr/, Cobb DOT at
https://www.cobbcounty.gov/transportation/current-bids-rfps and, BidExpress at
https://www.bidexpress.com. All Proposers that respond to a Cobb DOT-issued Design-Build solicitation,
are responsible for checking the GPR, Cobb County Procurement Services and Cobb DOT websites on a
regular basis for updates, clarifications, and announcements.
The project consists of a 10'-17' shared-use path with intermittent modal separation, a bridge over an unnamed creek, boardwalks over wetlands and environmentally sensitive areas, and treatment of untreated stormwater outfalls with nature-based stormwater Best Management Practices. The total length is approximately 1.3 miles, beginning at the southwestern quadrant of SR 139/Mableton Pkwy and Lee Industrial Blvd, continuing under the SR 139 bridge crossing the Chattahoochee River and along the River to Nickajack Creek. The Design-Builder will provide design, permitting, utility coordination and/or relocation, construction, and related services.
We post new exterior maintenance opportunities in Georgia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Georgia work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: Georgia Procurement Registry (solicitation PE-77050-NONST-2027-000000105), retrieved via the Georgia Procurement Registry (DOAS). View the official posting, and always confirm requirements and deadlines with the issuing agency.