Site visit is listed and attendance encouraged.
Questions deadline added.
WD changed.
The contractor shall provide all labor, materials, tools, personnel, supervision, transportation and equipment to prevent water entering the ground floor at 2200 Fort Roots Dr, North Little Rock, AR, including checking TPO for damage around the cant strip, installing a termination bar with correct fasteners, sealing between wall, TPO and termination bar and on top of the bar with polyether, high-grade polyurethane or TPO-compatible self-leveling, non-sag lap sealant or butyl sealant, reattaching horizontal and vertical face caps, replacing missing caps, disposing of metal flashing and sealing old screw holes with aluminum pop rivets and sealant, complying with VA TPO Specification 07 54 23 and VHA/OSHA fall and scaffold requirements, managing pavers and staging, disassembling and reassembling the courtyard awning if required, restoring pavers, removing window smudging, and performing final cleanup.
We post new asphalt opportunities in Mississippi as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""39157""RIDGELAND""MS""USA""715 SOUTH PEAR ORCHARD RD., PLAZA 1""AR20260032.txt"13061"file"".txt""1""2026-10-08T19:20:52.611+00:00""321b29a8e9614f6a9da7b84fca96ffbf""public""0""public""851a30c7b81c496b9af93b8356ff32d3""0"6"0""36C25627Q0022 0001.docx"17432"file"".docx""1""2026-10-08T19:20:52.611+00:00""e1c6c61e4e574097a6b21666cc6e2136""public""0""public""80468bbe1f9149369cc6f2357c699eed""0"5"0""SOW - B170 Courtyard Window Re-caulk final.docx"48592"file"".docx""1""2026-10-05T15:42:39.711+00:00""fd3471d8e6dc46e1b6ede7c93cd3db82""public""0""public""cdeb1e093aa44c0483643dd963b625a2""0"4"0""WD 2015-5117.pdf"44492"file"".pdf""1""2026-09-30T21:18:41.527+00:00""dd4b6f1e008f492dacaa4b44444acfb0""public""0""public""8413a00745ee401ca3b0309ae668a2bd""0"3"0""TPO Roofing 07 54 23.docx"51090"file"".docx""1""2026-09-30T21:18:41.527+00:00""deb3db2e0ff046668841bcda26dbdd75""public""0""public""196a687e92db4330a0e695840fd9de38""0"2"0""36C25627Q0022.docx"100377"file"".docx""1""2026-09-30T21:18:41.527+00:00""f2f01177af7041ae9cede8573ec7f0b6""public""0""public""77ac34f0c304495d98df4570ffb9d970""0"1"0"Most Mississippi work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice de1b803f367b43dbbb7cdfe263d36bd8), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.