Provide all labor, equipment, and materials for maintenance dredging, pre/post-hydrographic surveys, and material disposal per the 100% design specs (NAICS 237990) across four Tyndall AFB locations: 53 WEG Large Boat Piers (XLWU272001); 325 FSS Bonita Bay Recreation Docks (XLWU272002); 325 FSS Beacon Beach Floating Docks (XLWU218128); and Crooked Island Sound Channel (XLWU281001). The Government is securing environmental permits, to be provided prior to start of work.1. RFIs: Submit all questions in writing via email to the Contract Specialist no later than Monday, September 9, 2026, at 2:00 p.m. CDT.2.
RESPONSES: The Government will post answers via a solicitation amendment on SAM.gov/PIEE no later than Monday, September 16, 2026, at 2:00 p.m. CDT.3. PROPOSAL DUE DATE: Submit proposals electronically in accordance with the solicitation instructions no later than Wednesday, September 23, 2026, at 2:00 p.m. CDT.
Provide all labor, equipment, and materials for maintenance dredging, pre/post-hydrographic surveys, and material disposal per the 100% design specs (NAICS 237990) across four Tyndall AFB locations: 53 WEG Large Boat Piers (XLWU272001); 325 FSS Bonita Bay Recreation Docks (XLWU272002); 325 FSS Beacon Beach Floating Docks (XLWU218128); and Crooked Island Sound Channel (XLWU281001). The Government is securing environmental permits, to be provided prior to start of work.
We post new excavating opportunities in Florida as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"32403-5521""TYNDALL AFB""FL""USA""CP 850-283-8643""541 MISSISSIPPI RD""https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=FA481926R0040¬iceType=SolicitationNotice"0"link""1""2026-08-28T21:00:02.029+00:00""4e1b58932b894cce99b8d26f4a09cd6c""public""0""PIEE Solicitation Module Link for FA481926R0040""public""ecb7f7d4db1f495dbf70af5d7cfa3313""0"4"0""https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml"0"link""1""2026-08-28T21:00:02.029+00:00""45b60db2a9264befa3e848354a20faed""public""0""Web Based Training for the PIEE Solicitation Module""public""bd3995f9c8a24f74926d4c1c27435ee9""0"3"0""https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf"0"link""1""2026-08-28T21:00:02.029+00:00""e24d34fb1fcc43b7b2d29c0ec673ba8b""public""0""Registration Instructions for the PIEE Solicitation Module""public""4c06526f88b144d197fd44863e4fc3f0""0"2"0""https://dodprocurementtoolbox.com/"0"link""1""2026-08-28T21:00:02.029+00:00""35f3cd77dbdc4e85bf12a0b655d49728""public""0""Department of Defense Procurement Toolbox""public""f1f9fd77eccd46498b64c6ceb3fe2827""0"1"0"Most Florida work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice dd71e4b5094145819dbbea437ff988df), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.