PROGRAM SOLICITATION: Progressive Design-Build under Other Transaction Authority, pursuant to 10 U.S.C. 2808a for the delivery of the FY29 PN108808 Nonorganizational Vehicle Parking Garage, Tripler Amry Medical Center (TAMC), HI.
The "PIEE Solicitation Module Link for W9128A27RWP01" below includes the following attachments, DRAFT Attachments are FOR INFORMATION ONLY:
Solicitation_W9128A27RWP01_TAMC Parking
Attachment 1_Step 1: Request for White Papers_TAMC Parking W9128A27RWP01
Attachment 2_DRAFT Step 2: Invitation for Pitch Presentation_TAMC Parking W9128A27RWP01
Attachment 3_DRAFT Statement of Services; Draft SOS Attachments are FOR INFORMATION ONLY_TAMC Parking W9128A27RWP01
Attachment 4_DRAFT Model OT Agreement_TAMC Parking W9128A27RWP01
Attachment 5_DRAFT Division 01 Specifications_TAMC Parking W9128A27RWP01
Please focus your review and response on the Solicitation_W9128A27RWP01_TAMC Parking and Attachment 1_Step 1: Request for White Papers_TAMC Parking W9128A27RWP01. All remaining draft attachments are provided FOR INFORMATION ONLY to assist with background context; no response or action is required for draft items at this stage.
The project involves constructing a multi-level parking garage providing capacity for 1,350 vehicles, with structural bays optimized for vehicular circulation and parking layout, ADA-compliant spaces, stairwells and elevators for pedestrian circulation and egress, an integrated intelligent transportation information system, occupancy sensors, and fire protection and alarm systems. The work must preserve the historic integrity of the National Register eligible property while maintaining operational continuity of Tripler services throughout construction, which spans a Phase 1 preconstruction/design period and a Phase 2 full construction period.
We post new general contractors opportunities in Hawaii as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"96858-5440""FORT SHAFTER""HI""USA""KO CONTRACTING DIVISION""ZH BLDG 230 ATTN CEPOH CT""TAMC Parking - Industry Day Slides 20261116.pptx"8336425"file"".pptx""1""2026-11-18T18:08:10.795+00:00""a12a9e45a522477d83182b95168b9f54""public""0""public""4b9fc29fae504e83a6a2706a35841cfe""0"2"0""TAMC Parking - Industry Day - Sign-In Sheet.pdf"5435928"file"".pdf""1""2026-11-18T18:08:10.795+00:00""3d0d30f29490494d81b47fccbf18f439""public""0""public""6a0bbb5b89444540be31e3ed22e7d107""0"1"0""https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W9128A27RWP01¬iceType=SolicitationNotice"0"link""1""2026-11-13T02:58:29.863+00:00""d339d975cdf24324b7fd6732b2a47a7a""public""0""PIEE Solicitation Module Link for W9128A27RWP01""public""7cb3b462aff041c697d96578af553a07""0"4"0""https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml"0"link""1""2026-11-13T02:58:29.863+00:00""1a83692635dd4319b28492c2199cabd4""public""0""Web Based Training for the PIEE Solicitation Module""public""867850cd51a44aff80de0a0314458012""0"3"0""https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf"0"link""1""2026-11-13T02:58:29.863+00:00""95fe568144964e79b6dcde4402ec882f""public""0""Registration Instructions for the PIEE Solicitation Module""public""d16ca0fc51bc41298a6d94dc026921b4""0"2"0""https://toolbox-piee.eb.mil/"0"link""1""2026-11-13T02:58:29.863+00:00""d64dcc164c06425692f1c88b09d431a7""public""0""Department of Defense Procurement Toolbox""public""acf89faf8ba44cfe9e6e8ac3f0a04138""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice d62fd425f09d4f9b9833e25e0d7dfbf0), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.