Amendment 1, issued on 11/13/2026, is issued to add an RFI Q&A document.
Amendment 2, issued on 11/17/2026, is issued to extend the bid due date to 12/18/2026.
Please review all enclosures and attachments for details and requirements. Offerors shall submit documents to the Contract Specialist designated in this solicitation. Your quote/proposal pricing should be submitted on Enclosure C, but please also submit a separate document with details as to how your company meets the requirements of the RFQ (your standard proposal/quote document).
STEP files are available but are unable to be loaded into this system. Please contact the Contract Specialist for those files to be emailed. A technical note for these files: These STEP geometry files are NOT mechanical construction files. The files show a simplified view the 3D stripline kicker geometry based on the electromagnetic design, as illustration for the mechanical implementation of a RF test mockup (no vacuum) and of a vacuum compatible prototype stripline kicker. Beside that, there still is substantial thermal analysis to be performed by the vendor.
All questions are due, via email, to the Contract Specialist by 11/20/2026 at 5pm EST.
The Contractor shall furnish all labor, services, materials, and equipment to complete the mechanical design, manufacture, and verification of the ESR injection kicker prototype. This includes completing the detailed mechanical design based on BNL-provided electromagnetic design, manufacturing a simplified shortened stripline RF mockup for verification, manufacturing one (1) UHV-certified ESR stripline kicker prototype, and delivering a complete documentation package. The work also includes supporting Preliminary and Final Design Reviews, performing thermal analysis, and conducting RF characterization, cooling tests, and vacuum certification.
We post new goods & materials opportunities in New York as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"Richland""WA""US""2345 Stevens Drive""11973""Upton""NY""USA""P.O. Box 5000""THPLT163-1.PDF"844482"file"".pdf""1""2026-11-13T17:51:14.805+00:00""6c4b593499114c9c8d6ae7f62664f453""public""0""public""e2a24885436e41eebd0434f3209ade7e""0"11"0""RFI 483335 Questions and Answers.pdf"104598"file"".pdf""1""2026-11-13T17:51:14.805+00:00""0d75b161413248d385ffbdc8cb691607""public""0""public""6e503726131644f998735c38f4330516""0"10"0""Request for Quote 483335.pdf"303044"file"".pdf""1""2026-10-20T15:02:33.233+00:00""dfc384b2b04c4caf8a97c0a46169a6c4""public""0""public""5f046de1513a4c5bac9002d6675949db""0"9"0""Attachment 1 - Statement of Work EIC-INS-SOW-017.pdf"489100"file"".pdf""1""2026-10-20T15:02:33.233+00:00""92bf44d0d6fe430b8cbd56e1de1139cc""public""0""public""48401a9136cc42c1805a2db365e94565""0"8"0""Attachment 2 - Specification EIC-INS-SPC-010.pdf"525121"file"".pdf""1""2026-10-20T15:02:33.233+00:00""3fa74dba6f31409d9de098f22a44d048""public""0""public""44d93933677740ec99f0299de799a1e0""0"7"0""Enclosure A - Draft Contract with incorporated Terms and Conditions.pdf"220312"file"".pdf""1""2026-10-20T15:02:33.233+00:00""35b990ae30ec44eaaf6ee0a3d93b491d""public""0""public""935dd1ce649b442ca620abf00295816b""0"6"0""Enclosure B - AMS Form 050 Reps and Certs.pdf"1767815"file"".pdf""1""2026-10-20T15:02:33.233+00:00""f96ec70976fe44c9a6c8f6b0f7f7b984""public""0""public""c8a60bb4907f461ca87cf5e4667cc9d4""0"5"0""Enclosure C - AMS-Form-043.pdf"210115"file"".pdf""1""2026-10-20T15:02:33.233+00:00""5bdbfa9f239f49e39bcced1ea53af4c5""public""0""public""af7cca7b91334afeae1e761cf9b3e6a5""0"4"0""Enclosure D - Vendor ACH Authorization Form.pdf"116581"file"".pdf""1""2026-10-20T15:02:33.233+00:00""9907afe79874449aa2a17e76a2f71ec0""public""0""public""b16432ce6ea04bfc8de3c3d130c2799c""0"3"0""Enclosure E - W-9 Form (Domestic Vendors).pdf"140815"file"".pdf""1""2026-10-20T15:02:33.233+00:00""5bc1fd8b994c47a9967fcdb89faf7e23""public""0""public""7aa4e880a7a640148ce903f3ca0664c3""0"2"0""Enclosure F - W-8 Form (Foreign Vendors).pdf"314634"file"".pdf""1""2026-10-20T15:02:33.233+00:00""71849c94f19344fbb490ab29b834a686""public""0""public""98bd49c6ac7644d297b904bb8da81403""0"1"0"Most New York work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice d5b2459cb6f74187ac643b529a81dae2), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.