The U.S. Army Corps of Engineers, Rock Island District has a requirement for the fabrication and supply of ten Fiber Reinforced Polymer (FRP) composite structures for Brandon Road Lock and Dam, Joliet, Illinois, Des Plaines River. The gates include (2) 14 X 14 ft filling valves, (2) 14 X 14 ft filling downstream bulkheads, (2) 8 X 8 ft flushing valves, (2) 8 X 8 ft flushing valve bulkheads, and (2) 16 X 16 ft dam headgates.
NAICS Code: 326199
Size Standard: 750 employees
100% Small Business Set-Aside - Lowest Price Technically Acceptable
A pre-proposal meeting will be held virtually via Microsoft Teams on 29 October 2026, at 2:00 PM CT. Details and access instructions can be found within the solicitation.
Questions regarding this solicitation shall be submitted via ProjNet by 2:00 PM CT on 16 November 2026. See MVR.02 in the solicitation for additional information.
All solicitation documents are accessible via the link below titled "PIEE Solicitation Module Link for W912EK27RA001."
*Pre-proposal Meeting Slides are now included for reference in the Attachments section below.
Fabricate and supply ten Fiber Reinforced Polymer composite structures: two 14 X 14 ft filling valves, two 14 X 14 ft filling downstream bulkheads, two 8 X 8 ft flushing valves, two 8 X 8 ft flushing valve bulkheads, and two 16 X 16 ft dam headgates, for Brandon Road Lock and Dam on the Des Plaines River.
We post new goods & materials opportunities in Illinois as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"61299-5001""ROCK ISLAND""IL""USA""KO CONTRACTING DIVISION""1 ROCK ISLAND ARSENAL""BRIP FRP Pre-Proposal Meeting Slides 10-29-2026.pdf"3458824"file"".pdf""1""2026-11-09T16:19:55.055+00:00""c30638c6f562423a9c1ce6bc067899f0""public""0""public""4da4873e46074630b5f015be61a164d4""0"1"0""https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W912EK27RA001¬iceType=SolicitationNotice"0"link""1""2026-10-15T19:33:54.938+00:00""0886a41ddeb8448e93a3a25c83f88605""public""0""PIEE Solicitation Module Link for W912EK27RA001""public""5f120cbd8202467e804fb06e2250403f""0"4"0""https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml"0"link""1""2026-10-15T19:33:54.938+00:00""a585a85349fd43338804d73addba3bc1""public""0""Web Based Training for the PIEE Solicitation Module""public""f3118748d9a840b39bf54206130cf9b4""0"3"0""https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf"0"link""1""2026-10-15T19:33:54.938+00:00""f45510145bdc4d9aa0f0c247928b3a58""public""0""Registration Instructions for the PIEE Solicitation Module""public""fd954fcf0da146a7abf670077663be6a""0"2"0""https://toolbox-piee.eb.mil/"0"link""1""2026-10-15T19:33:54.938+00:00""17f69c4774c642a0ad49e2e0c409b074""public""0""Department of Defense Procurement Toolbox""public""9ec1cae451094b16a55b23bcfb63c9dd""0"1"0"Most Illinois work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice d593043bb5e1411784e4f97a9190a76e), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.