We'll email you new general contractors opportunities in Rhode Island as agencies publish them — free, unsubscribe whenever.
And get prequalified now, so the bond is never the scramble on the next one. Prequalify for bonding →
The Naval Undersea Warfare Center Division, Newport (NUWCDIVNPT) has a construction requirement for the design/build of a vaporizer enclosure. Please see attached Solicitation (N6660426Q0292) and all attachments for full information and details regarding this requirement.
Contractors do not have to be JCP certified to receive the Solicitation, including drawings, specifications, and photos, but they must have an active registration in SAM.GOV.
Interested parties should request access to drawings, specifications, and photos within the attachments section of this solicitation. NUWCDIVNPT will review and approved requests within SAM.GOV.
A controlled attachment requires special handling due to the information it contains. You must have a data entry or administrator role within the Contract Opportunities domain for an entity in SAM.gov in order to request access. If you do not have a proper role, you can request it from an existing entity administrator or have the existing administrator assign roles directly to you. If your entity does not have a direct employee, officer or board member appointed as the Entity Administrator, you will need to complete an Entity Administrator Appointment Letter.
You must request access to the attachment by clicking on its title and providing the reason you need access.
You will not receive immediate access to view the document. The contracting officer will review your request to grant or reject your access.
Your entity is responsible for managing the documents in accordance with prescribed directives.
https://www.fsd.gov/gsafsd_sp?id=gsafsd_kb_articles&sys_id=733b9d881bbc71506397ec21f54bcb0a
The contractor will provide firm-fixed-price design services including concept, schematic, design-development and final construction documents, and firm-fixed-price construction of the enclosure for Government vaporizer LP gas units in accordance with the approved final design, including structural steel design, foundation work, ventilation, Class I Division 1 and Division 2 hazard-rated systems, compliance with NFPA 58, NFPA 70, NFPA 72 and ASME standards, contaminated soil testing, staging and disposal procedures, and all required submittals, schedules and reports.
"02841-1703""NEWPORT""RI""USA""1176 HOWELL ST""N6660426Q0292 Amendment 0001.pdf"428638"file"".pdf""1""2026-09-29T15:55:49.079+00:00""a6bc4d4cde6342f5a221449675d9ab09""public""0""public""fdd3424d417b4b0087be45768516e991""0"7"0""Attachment_6_SITE VISIT INSTRUCTIONS .pdf"294698"file"".pdf""1""2026-08-26T18:52:41.795+00:00""7d8f739e7f8e4b14a5d66f46417874c2""public""0""public""3e45309444174d0d801977d8d7a1a51c""0"6"0""Attachment_5 Generator Usage Log.pdf"1147436"file"".pdf""1""2026-08-26T18:52:41.795+00:00""41ac7672fe5641eb8960e347321333fd""public""0""public""9ffdac71d7314b7db323c8f7a2acac6f""0"5"0""Attachment_4- Hazmat Usage Log.pdf"1848744"file"".pdf""1""2026-08-26T18:52:41.795+00:00""4866d07dee8246dca01b598dec5333ec""public""0""public""fd2b7276e29a43089910ff825847376e""0"4"0""Attachment_3_RI20260001 Davis Bacon _7_30_26.pdf"5958645"file"".pdf""1""2026-08-26T18:52:41.795+00:00""2b2f28c58d0d479dadd2c058a59d0fec""public""0""public""055c5352b0984ed588f4cf8ca72654de""0"3"0""Attachment_1_and _2_ Specification and Drawings- Design-Build (SOW).pdf"20777241"file"".pdf""1""2026-08-26T18:52:41.795+00:00""a41b1711ed6543068bdec742ee97572a""private""0""controlled""44598bc8157a48a6a8e8bd7cd5c6f27b""1"2"0""N6660426Q0292.pdf"432391"file"".pdf""1""2026-08-26T18:52:41.795+00:00""3ccc2590d2e745509413b533d35db07e""public""0""public""885855a3b23243169f52e5f7f9a2af31""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice d5856d8a91d3445887652db4f6bf8a06), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.