Requirement & Scope of Work
The Department of the Air Force, Nonappropriated Fund Instrumentality (NAFI), issues this combined synopsis/solicitation to procure all necessary labor, supervision, materials, tools, transportation, and equipment required to design, furnish, and install a complete wet-pipe automatic fire suppression system in Building 450. The scope includes associated HVAC modernization, architectural adjustments, electrical work, and plumbing tie-ins as detailed in the attached Statement of Work and project specifications for Project CTGB 13-2020.
Nonappropriated Fund Instrumentality (NAFI) Notice:
This is a procurement by a Nonappropriated Fund Instrumentality (NAFI) of the Department of the Air Force. The NAFI is an integral part of the Department of Defense and is an instrumentality of the United States Government. No appropriated funds of the United States shall become due or be paid to the Contractor by reason of this contract. This procurement is conducted in accordance with DAFMAN 64-119 and DoDI 4105.67, and is not subject to the Contract Disputes Act of 1978 or the FAR unless expressly referenced.
Schedule of Events & Milestones
The solicitation is officially issued on September 2, 2026. An organized site visit will be conducted on September 17, 2026, at 10:00 AM Eastern Time; all prospective offerors are encouraged to attend and must coordinate base access requirements prior to the visit. EMAIL the Contracting Officer to RSVP and receive base access background check steps at least 4 business days prior to the site visit.
All technical and administrative questions regarding this solicitation must be submitted in writing no later than September 24, 2026, at 10:00 AM Eastern Time. The solicitation closes, and all proposals must be received, no later than October 8, 2026, at 10:00 AM Eastern Time. Late submissions will not be considered.
Proposal Submission & Point of Contact
Offerors must submit complete proposal packages electronically via email prior to the closing deadline.
All questions, site visit RSVPs, and proposal submissions shall be directed to Cedric Roberts at cedric.roberts@us.af.mil.
The scope includes the design and construction of a new, heated, self-supporting interior office space and an operational wet-pipe automatic fire suppression system protecting the new interior office area only within Building 450. The work also includes associated HVAC modernization, architectural adjustments, electrical work, and plumbing tie-ins as detailed in the attached Statement of Work and project specifications for Project CTGB 13-2020.
We post new other opportunities in Indiana as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"46971-5000""GRISSOM ARB""IN""USA""ADMINISTRATIVE ONLY NO REQUISITIONS""448 MUSTANG AVE""Question and Answers - B450 Fire Suppression System Installation.docx"14724"file"".docx""1""2026-09-18T11:43:37.655+00:00""58da7e32733f415b8e356d3fc314bc88""public""0""public""b9317e2b121a4c0386aaa3f2582d7c44""0"7"0""Grissom Air Reserve Base Standards.pdf"8315409"file"".pdf""1""2026-09-02T18:04:22.026+00:00""815e968efdd942db8252bb4d5f6ddb1e""public""0""public""d2f75387b37141d68d64437841ff48d2""0"6"0""Davis-Bacon Act WD IN20260002 Mod 2.pdf"1498796"file"".pdf""1""2026-09-02T18:04:22.026+00:00""732cce0cf154489bb54f26ecba10285d""public""0""public""0b4db723fae8448d9c703752d050a922""0"5"0""Grissom DBIDS - How to Request Base Access.pdf"599471"file"".pdf""1""2026-09-02T18:04:22.026+00:00""f1fd897ceebf40ae911555b00db4b458""public""0""public""03d5a938c8dd488f88f7f1070b45b173""0"4"0""Solicitation - FA465426R0010.pdf"448382"file"".pdf""1""2026-09-02T18:04:22.026+00:00""4abeabe10ab54691b2d3df31141c1d78""public""0""public""42a7564fd23d48098270a1140d12ddde""0"3"0""Statement of Work.docx"26173"file"".docx""1""2026-09-02T18:04:22.026+00:00""66eecb4d9a934851b59b6ce34b8ea7e0""public""0""public""057a669def8e4901a0c29c816de84004""0"2"0""Grissom ARB Environmental Requirements (5).docx"35420"file"".docx""1""2026-09-02T18:04:22.026+00:00""cb83eb1f8cde4209af9412b60ca322ce""public""0""public""da2a349ee957456bb9e7c308530243ab""0"2"0""NAF Construction Clauses.pdf"177923"file"".pdf""1""2026-09-02T18:04:22.026+00:00""265f1c1cdfce43e2aea329ee156d0c96""public""0""public""c538ee8c61a24d96a513deac44813c0a""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice d3c1297d4f714962b862d8dad8b10b8f), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.