We'll email you new excavating opportunities in Minnesota as agencies publish them — free, unsubscribe whenever.
And get prequalified now, so the bond is never the scramble on the next one. Prequalify for bonding →
This is a solicitation for commercial construction in accordance with RFO parts 12 and 36.
Solicitation number 12445527Q0008 is issued as a Request for Quotation (RFQ) for the upgrading of well equipment, including: submersible pump, buried pressure tank, frost-free hydrant, control box, pressure switch, pitless adapter, electrical wiring and extending the well casing.
This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 237110 Water and Sewer Line and Related Structures Construction. The small business size standard is $45,000,000.00. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency.
The contractor shall provide all labor, materials, and incidentals to upgrade the well equipment at Whiteface Campground. Work includes replacing the submersible pump, buried pressure tank, frost-free hydrant, control box, pressure switch, pitless adapter, electrical wiring, and water line; extending the well casing to 12-18 inches above grade; excavating and backfilling; installing pipe and fittings; performing hydrostatic testing; disinfecting the water system; and demobilizing. Option items cover replacing the pitless adapter on loop 3 well, replacing well equipment on loop 4 well, and replacing the pitless adapter on loop 4 well.
"US""US""303092449""Atlanta""GA""USA""1720 Peachtree ST NW STE 876S""Q_and_A-12445527Q0008.xlsx"35267"file"".xlsx""1""2026-11-19T14:07:26.05+00:00""03e91ce856d544c3ab28adb0d6abc4c7""public""0""public""347d5ee82af644f0924d41d49f55de48""0"7"0""Q_and_A-12445527Q0008.xlsx"35309"file"".xlsx""1""2026-11-17T20:35:34.707+00:00""e7fcae778c944aa2995624d3a09532d7""public""2026-11-19T14:07:26.05+00:00""1""public""c5e87894aa184e2d8a8955048be4b17a""0"6"0""2026-11-19T14:07:26.05+00:00""Sol_12445527Q0008.pdf"251922"file"".pdf""1""2026-11-16T14:34:22.428+00:00""3cd040a5839543d99988a8cd84219ce7""public""0""public""d143c879f55e456ea28ce58b5028754b""0"4"0""Att 01_Schedule of Items_261105.docx"17821"file"".docx""1""2026-11-16T14:34:22.428+00:00""37047ca7366c417681c6ce3c8bf04338""public""0""public""799f7956d795492091b978632bd7b6cd""0"3"0""Att 02_SOW and Specs_261026.pdf"2708639"file"".pdf""1""2026-11-16T14:34:22.428+00:00""6c5ac3e95abd4c8cb878f54b63f0ea69""public""0""public""0923352ab6fe4bd8a3513feb86e1a8f5""0"2"0""Att 03_Wage Rates_260730.pdf"75951"file"".pdf""1""2026-11-16T14:34:22.428+00:00""058c585f6c4e4247bc57a9bd6ccad3b8""public""0""public""1ce0d30890b64a72ae062ea7520eeeb2""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice d3648b6a631b4b74911586ae0f0cf9f7), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.