ID-KOOSKIA NFH-GRAVEL PROJECT Amendment 2 UPDATED SOW
The contractor shall furnish and deliver up to six truckloads (approximately 12 cubic yards each) of 3/4-inch minus gravel to designated locations along the access road, spread the gravel in low areas, potholes, and washouts, use a motor grader to shape and smooth the surface, re-establish proper road crown and drainage, blend new gravel with existing materials, and compact the gravel using a vibratory roller or equivalent equipment until the surface is firm, stable, and shows no visible movement or excessive rutting.
We post new goods & materials opportunities in Virginia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"Sol_140FF027Q0059_Amd_0002.pdf"856652"file"".pdf""1""2026-11-16T19:33:17.946+00:00""d690866273f84163851c10fa92c489ad""public""0""public""7a61bda064d24c6cbd5fe78f78d364d2""0"3"0""Sol_140FF027Q0059_Amd_0001.pdf"836231"file"".pdf""1""2026-11-10T13:36:48.094+00:00""48e1e595de4a4359b6f7e6c7c9182984""public""0""public""6545dae5e0914fcc963aa1c78c90d3df""0"2"0""Sol_140FF027Q0059.pdf"773775"file"".pdf""1""2026-11-05T18:10:21.775+00:00""a7652ed4bf2844bbb8f9b964b4193595""public""0""public""6771bccd93604056a8eb7f07a8228a84""0"1"0"Most Virginia work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice d2e871008d75482a8aa2e9bbe602d8a2), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.