Contractor to provide Refurbish Forge Hammer Services per the Statement of Work and associated drawings in support of Production at Watervliet Arsenal, NY 12189. Refurbish Forge Hammers: 12 Each G5391 and 12 Each G5392 as per DRAWING indicated on statement of work (SOW). Please Provide Pricing as follows: Maximum Lot Size is _____ pieces Minimum Lot Charge is $_____ Additional per piece price $_________ Turnaround Time is _____ Calendar Days Any unused funds will be de-obligated at contract closeout. Service Contract Labor Standards Wage Determination No. 2015-4143 Latest Revision applies and is incorporated by reference. All shipping cost to be included in unit/lot pricing. TECHNICAL POC: DAN WEATHERWAX
Product Service Code: J036; North American Industry Classification System (NAICS): 332710; Weapon System Code: 000; 100% SB Set Aside
The contractor must refurbish 12 each G5391 and 12 each G5392 Rotary Forge Hammers. Work includes: removing 1/2" of the hard facing layer, thermally stress relieving after hardfacing removal, evaluating for cracks, welding with Cormet F115 weld filler, thermally stress relieving after welding, machining to proper height, modifying the clamping angle to 45°, widening the open angle of the clamping area to 100°, machining a 5mm x 50° bevel on the base, removing previous engraving and adding new engraving per drawings, and providing a certificate of conformance for each set of hammers.
We post new goods & materials opportunities in New York as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"12189-4000""WATERVLIET""NY""USA""KO CONTRACTING OFFICE""1 BUFFINGTON ST BLDG 10""G6211 weld porcedure.pdf"236261"file"".pdf""1""2026-10-29T19:57:18.722+00:00""29716b24a3534c249fb17fd0eeaf0db9""public""0""public""cad9ed4f86a34ad68b54b5fe86c5be91""0"6"0""G6211 weld procedure.pdf"236261"file"".pdf""1""2026-10-29T19:57:18.722+00:00""2a1825b570244b6b838e039d2f2f885d""public""0""public""ae4fa314231c4da59ad0e49a2c946650""0"5"0""G5391 Layout1 (1) 13 degree.pdf"82061"file"".pdf""1""2026-10-29T19:57:18.722+00:00""cd40dd57ff414fc99e53685026372375""public""0""public""e147773b5f6a4632bed88227bf5f863d""0"4"0""G5392 Layout1 (1) 15 degree.pdf"82243"file"".pdf""1""2026-10-29T19:57:18.722+00:00""87de29301368448b84377f7101cbff2e""public""0""public""e378223c7399424381e2e8f8bdbdee4e""0"3"0""98006843 SOW.docx"22929"file"".docx""1""2026-10-29T19:57:18.722+00:00""53bf703f10094779bec57d22a2d4778d""public""0""public""5eee8eb2df8d44bebc0c89a6467740cf""0"2"0""Solicitation - W911PT27QA024.pdf"3306675"file"".pdf""1""2026-10-29T19:57:18.722+00:00""0251c69441434d55b8f3f79ef745649b""public""0""public""83e75fc24c4648b5a93f560ebf53d0a7""0"1"0"Most New York work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice d21e0f1d7ece4d45b00ad592c4278930), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.