**PROJECT: **CA NP KICA PMS(1), Pavement Preservation Kica Cedar Grove
**LOCATION: **All project work is in Kings Canyon National Park – Cedar Grove area. The approximate latitude and longitude coordinates for the project are: 36°47'26.13"N, 118°40'4.53"W.
**WORK: **This project consists of pavement preservation. See “Project Description”posted under Attachments for additional details.
LENGTH: Base** **Schedule consists of 14.70 miles of pavement preservation and parking areas. Option Xconsists of 0.84 miles of asphalt overlay.
TENTATIVE COMPLETION DATE: Fall 2027
CONTRACT TYPE: Firm-Fix-Price Task Order Contract
ESTIMATED PRICE RANGE: Between $2,000,000 and $5,000,000
INTERESTED VENDORS LIST: To view the Interested Vendors List, you must register as a SAM user, be logged in, and linked to an entity. If you are signed into SAM.gov with your registered entity and you cannot see the Interested Vendors List, you will need to be assigned the Contract Opportunities Administrator role for your entity in SAM.gov. If you need assistance, go to https://www.fsd.gov/gsafsd_sp.
NOTICE OF SUBCONTRACTING OPPORTUNITY:
This project will be solicited to the Western Region Pavement Preservation MATOC.Contractor Information on the IDIQ contractor may be found on our web site at: https://highways.dot.gov/federal-lands/business/construction-contracting-idiq/west-region pavement-pres
This project is anticipated to be solicited in Fall/Winter 2026
This project includes a Base Schedule and one Option Schedule (X).
PRELIMINARY PLANS are in electronic format only and are posted with this synopsis. To ensure you receive notification when the solicitation documents are posted toSAM.gov, please click on the “follow” but-ton at the top of the opportunity page. When solicitation documents are issued, the REQUEST FOR PROPOSAL (specifications and plans) will be posted at this link.
The Base Schedule includes 14.70 miles of pavement preservation and parking area work such as full depth reclamation, roadway aggregate placement, micro surfacing (Type 2 and Type 3), crack sealing and filling, asphalt pavement patching, pavement markings, temporary traffic control, and general labor/equipment rental. The Option Schedule X adds 0.84 miles of asphalt overlay at Canyon View Campground roads including full depth reclamation and 3-inch asphalt concrete pavement. The project also includes thin epoxy polymer overlay work on five bridges (Lewis Creek, Granite Creek, Roaring River, Lower South Fork Kings River, and Upper South Fork Kings River bridges) along Cedar Grove Road.
We post new asphalt opportunities in California as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""US""98661""VANCOUVER""WA""USA""DOT FEDERAL HIGHWAY ADMIN""610 E FIFTH STREET""PROJECT DOSCRIPTION_CA NP KICA PMS(1).pdf"288855"file"".pdf""1""2026-08-13T15:57:03.01+00:00""3423ddad9b6f4093bfe693f61ce5e2bc""public""0""public""0d77187f4eba4c449b452157e33745f1""0"3"0""Prelim Letter_CA NP KICA PMS(1) v2.pdf"214741"file"".pdf""1""2026-08-13T15:57:03.01+00:00""ce4c40bab9de471483cbb442ebf5c494""public""0""public""57c8f571fb624847ae7b8ccf9abab69d""0"2"0""Prelim Plans_CA NP KICA PMS(1).pdf"5710730"file"".pdf""1""2026-08-13T15:57:03.01+00:00""0f822cd013454dfba2461b2f09e35638""public""0""public""161a9163e3ea4f2eade2a8fa056ae161""0"1"0""https://highways.dot.gov/federal-lands/business/construction-contracting/west-region-pavement-pres""Link to MATOC information"0"link""1""2026-08-13T15:57:03.01+00:00""c4c47237e39c449f9bebb3a5ddac794f""public""0""Link to MATOC information""public""4fa8a325918d4c83a1644290bd2e45d5""0"1"0"Most California work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice d1274eee16e94e23b9e1e9ab226bc6c8), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.