AK-KENAI NWR-AUDIOVISUAL REPAIR
The contractor shall provide all labor, materials, tools, equipment, and services necessary to plan, design, develop, install, train, staff, install, and provide a one-year warranty for a complete and working AV system for the existing visitor center multipurpose room. The work includes removing all existing AV equipment (except the Draper Electric Projector Screen and 70v Crestron Ceiling Speakers), and installing a new system with a 7,000-lumen laser projector, two 82" 4K TVs, an HDMI matrix video switcher, HDMI & USB-C presenter input plates, a Blu-ray/DVD player, two 1080p PTZ cameras, five wireless microphone systems, a room microphone, an audio digital signal processor, audio description and hearing assistance transmitters, a UPS, and a control system with two 10" touchscreens. The contractor must also provide testing, training for four Refuge staff, and deliver operation documents including shop drawings, as-built drawings, and an operation manual.
We post new electrical opportunities in Virginia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""22041""Falls Church""VA""USA""FWS, Construction A/E Team 3""5275 Leesburg Pike""Sol_140FC326Q0054_Amd_0002.pdf"208554"file"".pdf""1""2026-08-31T15:14:59.418+00:00""7e9cd76044c04cf4a4509011caa8b6a7""public""0""public""ed23e1bc1af343b5bae0144826124af9""0"3"0""Sol_140FC326Q0054_Amd_0001.pdf"1500408"file"".pdf""1""2026-08-27T22:18:24.167+00:00""7ede0002b02143259942d56ab24f78de""public""0""public""b0a35941cece4524a320f7fecd312a7b""0"2"0""Sol_140FC326Q0054.pdf"7806991"file"".pdf""1""2026-08-24T19:38:48.994+00:00""5020954140f344e7b12267e449429344""public""0""public""91b37704997b4da0afcbd690d9aee726""0"1"0"Most Virginia work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice cfb6b8ef0cc2463091df78687042b79b), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.