We'll email you new flooring opportunities in Pennsylvania as agencies publish them — free, unsubscribe whenever.
And get prequalified now, so the bond is never the scramble on the next one. Prequalify for bonding →
The purpose of this amendment is to provide responses to RFIs received from the site visit. See attachment section for RFI responses.
The Eastern Regional Research Center requires repairs and recoating of approximately 2700 SF of flooring and 450 linear feet of cove base in the Mechanical Services Building second floor laboratory. The work includes preparing existing floor and cove base surfaces per manufacturer recommendations, treating cracks, control and expansion joints, applying a pure epoxy base coat and chemical-resistant polyaspartic finish coat with non-skid texturing, meeting BSL-2 sanitation, UFGS 09 67 23.14, and chlorinated washdown resistance, with color determined at material submittal.
"US""US""20705""BELTSVILLE""MD""USA""5601 SUNNYSIDE AVENUE""C05_Sol_124PCA27Q0008_Amd_0001.pdf"83853"file"".pdf""1""2026-11-20T19:39:50.345+00:00""d75140e8610f4139bcf1fa575683d463""public""0""public""1a13d29b2e66461da6aa7a7e5dc55653""0"7"0""C05_RFIs and Responses to Solicitation 124PCA27Q0008.docx"30879"file"".docx""1""2026-11-20T19:39:50.345+00:00""87d61cdb8393442fac362647635da2be""public""0""public""5fc97e440e3c4f8abe6f801306eed9af""0"6"0""C04_SOWv2.docx"76382"file"".docx""1""2026-11-10T14:12:01.328+00:00""355f354ac2cc42a8ade0cd052228809d""public""0""public""66f7b657a614416797c60e612e9ec6fd""0"5"0""C04_Sol_124PCA27Q0008.pdf"593143"file"".pdf""1""2026-11-09T19:24:56.195+00:00""61d88f55a6d84de7910e5fa49d1893b1""public""0""public""f3cefe10eb58436bbfc7989077f5652a""0"4"0""C04_Wage Determination.pdf"41831"file"".pdf""1""2026-11-09T19:24:56.195+00:00""77507424e5b04a3b904c2d1736ef9b3c""public""0""public""ae34bbeb9b8e48adb8bd6c58f5585502""0"3"0""C04_Drawing.pdf"56787"file"".pdf""1""2026-11-09T19:24:56.195+00:00""954a2c4dca194044a7404d0dccb91b62""public""0""public""a25335a7de8849a884d66dec3f6e0e51""0"2"0""C04_SOW.docx"76154"file"".docx""1""2026-11-09T19:24:56.195+00:00""688f54a167d940c29c802c94516dbb3e""public""0""public""6033a886682b4fb2a546d600110cbc6d""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice cf9968445de54e8aaa88d684a0744bdf), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.