Amendment 0004: The purpose of this amendment is to extend the quote due date from "5 October 2026" to "16 October 2026" and add a revised Statement of work, Drawings, AOI Requirements, Storm Water & Erosion Certificate, AF 103, Work Permit, and Storm Water Inlet Protection attachments.
Amendment 0003: The purpose of this amendment is to extend the quote due date from "24 September 2026" to "5 October 2026" and to add the Liquidated Damages Clause and amounts.
Amendment 0002: The purpose of this amendment is to incorporate a revised Statement of work, Drawings and questions and answers/RFIs
Amendment 0001: Add final day to ask questions or submit RFIs.
This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with FAR parts 12 and 36, as modified by the Revolutionary FAR Overhaul (RFO) Class Deviations. This announcement constitutes the only solicitation. Offers are being requested and a separate written solicitation will not be issued.
Funds are not presently available for this acquisition. The Government anticipates funds will become available prior to award as this action has been identified on the National Guard priority list. No contract award will be made until appropriated funds are made available
Solicitation number W50S74-26-Q-A020 is issued as a request for quotation (RFQ) for project titled Repair AC Paving.
The full text of provisions and clauses may be accessed electronically at www.acquisition.gov.
CLIN 0001 Repair AC Paving, Area 1 Consisting of Demo, Overlay and Striping for 2276,2273,2278 and 2283 in accordance with SOW and Drawings
CLIN 0002 Option 1, Repair AC Paving, Area 1 Consisting of Prep, Slurry and Striping for 2276,2273 and 2283 in accordance with SOW and Drawings
CLIN 0003 Option 2, Repair AC Paving, Area 2 Consisting of Prep, Slurry and Striping for Areas 2267, 2272, 2271 in accordance with SOW and Drawings
CLIN 0004 Option 3, Repair AC Paving, Area 2 consisting of Prep, Slurry, and Striping for 2270 and 2274 in accordance with SOW and Drawings
CLIN 0005 Option 4, Repair AC Paving, Area 3 consisting of Prep, Slurry, and Striping for 2315 and 2339 in accordance with SOW and Drawings
CLIN 0006 Option 5, Repair AC Paving, Area 1 consisting of Prep, Slurry, and Striping for 2274 in accordance with SOW and Drawings
CLIN 0007 Option 6, Repair AC Paving, Area 4 consisting of Prep, Slurry, and Striping for 2275 in accordance with SOW and Drawings
CLIN 0008 Option 7, Repair AC Paving, Area 1 consisting of Prep, Slurry, and Striping for ROAD in accordance with SOW and Drawings
CLIN 0009 Option 8, Repair AC Paving, Area 1 consisting of 2283, Demo Paving, Demo Tree, Grading, Add & Compact Base, Paving, PCC Flush Curb, and Striping in accordance with SOW and Drawings
Period of Performance is 120 days after notice to proceed.
See list of solicitation provisions that apply to the acquisition in attached SF 1442
See list of contract clauses that apply to the acquisition in attached SF 1442
Questions are due by 1300, 18 September 2026 PST
Quotes are due by 1300, 5 October 2026 PST
A site visit is scheduled for September 15 at 1000 PST. Site visit is not required, but encouraged. In order to attend the site visit you MUST submit your pass request (see attachments) no later than 9 September at 1100 PST.
Set-Aside: Small Business
This solicitation incorporates provisions and clauses by reference.
Product / Service Code: Z2LZ
NAICS 238990
Business Size Standard $19,000,000.00
Project Magnitude: Between $500,000 and $1,000,000
Equitable Adjustments will be made in accordance with DFAR 252.243-7002, please note, any equitable adjustments submitted are not considered acceptable unless agreed to in writing by the contracting officer and included in a modification. Upon submission of a request for equitable adjustment, the Government attempts to finalize within 30 to 60 days upon receipt of an adequate definitization change order proposal.
The contractor shall provide all materials, supplies, and equipment necessary to provide paving services for March ARB. Work includes design, inspection, preparation, slurry seal types II and III, mill and overlay, demolition, grading, curbs, full depth replacement, landscaping, striping, and signage. Specific tasks include cleaning pavement areas, crack filling, applying slurry seal, milling and overlaying asphalt, full depth pavement replacement with base and HMA, PCC paving, pavement marking and signage, and providing an independent inspector. The contractor must also provide a Storm Water Inlet Protection Plan and comply with all applicable codes and standards.
We post new asphalt opportunities in California as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"92518-1715""MARCH ARB""CA""USA""KO FOR CAANG DO NOT DELETE""1560 GRAEBER ST SUITE 29""Solicitation Amendment W50S7426QA0200004 SF 30.pdf"4008179"file"".pdf""1""2026-10-05T14:52:55.617+00:00""99cffdc0e0f04269881a31692adb3709""public""0""public""38bb2695edb34eb1bad5dc22393cc132""0"135"0""Solicitation Amendment W50S7426QA0200003 SF 30.pdf"3991169"file"".pdf""1""2026-09-29T13:47:23.593+00:00""5a8517c8518248d9874d5c6449db84eb""public""0""public""4876312d4c074713abd7778a1ebf4867""0"134"0""Solicitation Amendment W50S7426QA0200002 SF 30.pdf"4000438"file"".pdf""1""2026-09-21T17:30:11.192+00:00""c40bebee9e5a4ce5b93cc224a2c95318""public""0""public""ba70cd24039b487b918573b0b8ef00b0""0"133"0""Solicitation Amendment W50S7426QA0200001 SF 30.pdf"4005737"file"".pdf""1""2026-09-09T18:47:44.262+00:00""fef7690f6996460e9545993d5820a3de""public""0""public""8d4f929faec04ad0a7be3dde38846d92""0"131"0""Solicitation - W50S7426QA020.pdf"6426296"file"".pdf""1""2026-09-04T22:24:42.399+00:00""8c31dfc641bd4b09a9f5bd23b1aa7985""public""0""public""da753184e9ac4da381811fd82ed74269""0"128"0""Attachment 1 Revised Statement of Work.pdf"335484"file"".pdf""1""2026-09-21T17:30:11.192+00:00""c1279d4a310e4634a7d2f720a6b9bb75""public""2026-10-05T14:52:55.617+00:00""1""public""f85ba41968d74d0799718a71b1fa81d0""0"104"0""2026-10-05T14:52:55.617+00:00""Attachment 1 2nd Revised Statement of Work.pdf"66902"file"".pdf""1""2026-10-05T14:52:55.617+00:00""7081851eddce4d97a4440bdb9ecf1128""public""0""public""261fe43d53954c13b8f4735cc694b135""0"78"0""Attachment 2 AF Form 66.pdf"64372"file"".pdf""1""2026-09-04T22:24:42.399+00:00""cb6ba107d84049e98b66d76d31010ae6""public""0""public""a1ab3cdd18164532adc92d2171041d92""0"72"0""Attachment 3 Revised Drawings.pdf"1252397"file"".pdf""1""2026-09-21T17:30:11.192+00:00""54f7cb6d62c349fdbfca44a1aca09200""public""2026-10-05T14:52:55.617+00:00""1""public""3fc074b9e4704ba7ae57af3fb6ac5e9f""0"68"0""2026-10-05T14:52:55.617+00:00""Attachment 3 Revised Drawings.pdf"2275796"file"".pdf""1""2026-10-05T14:52:55.617+00:00""79abd283781f45bea7480b226e63ce59""public""0""public""5f2a2d5359d44d189685c5a80c634312""0"62"0""Attachment 4 General Info For March ARB.pdf"406672"file"".pdf""1""2026-09-04T22:24:42.399+00:00""32f38aef5b7e4f358387c9e36c6faa6a""public""0""public""40faa788dc7743eb888c38f57ff46db6""0"57"0""Attachment 5 Wage Determination CA20260025.pdf"118202"file"".pdf""1""2026-09-04T22:24:42.399+00:00""6fe09c45f35744f29cea14decef28527""public""0""public""18fe724fc3a4419f8801a01f77f89214""0"50"0""Attachment 6 Base Pass Request.pdf"284560"file"".pdf""1""2026-09-04T22:24:42.399+00:00""9ba0af1a28d549b6ae1139fa9bd985d5""public""0""public""637758d0cc8e4f4194dee535b46a131d""0"43"0""Attachment 7 RFI Questions and Responses.pdf"673067"file"".pdf""1""2026-09-21T17:30:11.192+00:00""e7ac6a5f6b584022a235e3f91c1f54e1""public""0""public""cb2ce3562e1840eb85ada0f23df0f5ec""0"37"0""Attachment 8 AOI Requirements.pdf"174528"file"".pdf""1""2026-10-05T14:52:55.617+00:00""2457ea07b8dc4a1cb403a03d6734e26a""public""0""public""d6346985b7d449218102578a158bf36c""0"33"0""Attachment 9 Storm Water and Erosion Certificate.pdf"955417"file"".pdf""1""2026-10-05T14:52:55.617+00:00""e72071f4a64c4ecfb6dded62a31f2063""public""0""public""47a93afbb00e414fb948d80da86b1e3c""0"30"0""Attachment 10 AF103 Work Permit.pdf"1459295"file"".pdf""1""2026-10-05T14:52:55.617+00:00""c63a1396663a4d24843e2474c2e64531""public""0""public""e6a55588672547bca8e89a4729babd0a""0"28"0""Attachment 11 Storm Water Inlet Protection.pdf"1049231"file"".pdf""1""2026-10-05T14:52:55.617+00:00""175262bc1bca4a43a9422a914dc94704""public""0""public""724df4b0fff945a0a3f7e084fab966c7""0"27"0""SIGN IN ROSTER.pdf"4459344"file"".pdf""1""2026-09-17T17:50:20.244+00:00""afd99b729abb4f29998d24e87dc4326d""public""0""public""aad5105ab4364f509593b2b820fe7d53""0"26"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice cf056f605b6a421a926d673e2d7fcbf2), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.