GRTE 237343 - "Rehabilitate 4 Lazy F Ranch Cabins for Employee Housing"
This solicitation is being issued as a Total Small Business Set Aside. Please see the attached solicitation package for details regarding this construction project at Grand Teton National Park. NPS will be hosting an on-site presolicitation meeting in late October, details for this meeting will be posted via a solicitation amendment. Please contact only the Contracting Officer if you have questions pertaining to this project. Thank you for your interest in working with the National Park Service.
The work includes the design, permitting, and construction of a new water distribution system, new sewer collection system including lift station, force main and gravity main, along with new buried telecommunications and underground power. Utility work will include connections to proximate electrical, water, sanitary sewer, and telecommunication services at each lodging building. The work also includes rehabilitation of all structures listed above including roof replacement, foundation repair/replacement, other structural upgrades, exterior log repairs and refinishing, pest exclusion, historic window and door repairs, updating electrical, telecommunications, and plumbing systems to modern codes, installation of new fire suppression, and other preservation work. The sleeping cabins will retain their historic function as bedrooms with attached bathrooms and the Main Lodge will have two bedrooms and bathrooms which will be updated to comply with accessibility requirements. The Main Lodge will also have a kitchen, dining room, shared laundry room, and living space to be shared by all tenants of the ranch. Associated Site work will include providing a tenant parking area, (1) accessible parking space east of the Main Lodge and (1) accessible parking spot east of the garage, maintained in-kind access road, and pathways connecting buildings.
We post new general contractors opportunities in Colorado as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""80225""DENVER""CO""USA""12795 W ALAMEDA PKWY PO BOX 25287""Sol_140P2026R0098.pdf"287438"file"".pdf""1""2026-09-21T22:07:35.33+00:00""a2c6d639271e4c32b089de2742bbda0d""public""0""public""ec639ec7e69d4a19a72119e692647f9c""0"12"0""B08_140P2026R0098_GRTE_4LazyF.pdf"714451"file"".pdf""1""2026-09-21T22:07:35.33+00:00""4967d42ae2264316b454ca36178f44f4""public""0""public""3014e15766c6441aa9dc804e4d7d8880""0"11"0""B08_Attachment_01_GRTE_4_Lazy_F_Rehab_Final_CD_Drawings_-_REDUCED_SIZE.pdf"86457263"file"".pdf""1""2026-09-21T22:07:35.33+00:00""f7b2939ba16d431c85547b8fa667af93""public""0""public""186d6ae4774c49f5a9becc8fc0115926""0"10"0""B08_Attachment_10_Proposal_Submission_Package_GRTE.docx"64061"file"".docx""1""2026-09-21T22:07:35.33+00:00""ebab3e02e7b449fda33a45754533fd34""public""0""public""27e33d5c237f4c12808b72c4badf286d""0"9"0""B08_Attachment_09_DOL_Wage_Determination_WY20260041.pdf"273448"file"".pdf""1""2026-09-21T22:07:35.33+00:00""2031aa151cec4033930822957f3e9fa2""public""0""public""e00723fdfc864190a6629efb12e4df2c""0"8"0""B08_Attachment_04_GRTE_237343_-_Combined_Histoplasma_Report_999-5237.pdf"1554376"file"".pdf""1""2026-09-21T22:07:35.33+00:00""07fec856eb4d4caca7fbf235688ce230""public""0""public""1fbedd2683804d1299b6f2e7472eace5""0"7"0""B08_Attachment_05_GRTE_237343_-_Combined_Lead_Based_Paint_Report_999-5237.pdf"19727459"file"".pdf""1""2026-09-21T22:07:35.33+00:00""805f2adb8ae34599b20c70885cc3f029""public""0""public""b6d65c22951f47059825549d85ed1f75""0"6"0""B08_Attachment_06_GRTE_237343_-_Geotechnical_Engineering_Report_09_19_25.pdf"8134688"file"".pdf""1""2026-09-21T22:07:35.33+00:00""6ff778eea21349ea8f9b3bc5f67f6906""public""0""public""60caa1337cc840208ce95292336b2ace""0"5"0""B08_Attachment_07_GRTE_237343_-_Water_Sewer_Design_Report.pdf"5144951"file"".pdf""1""2026-09-21T22:07:35.33+00:00""2e67d9334a5e4727836ebe1a900a2bc4""public""0""public""10c450ff6bc4459e95cd0e5fc9e23035""0"4"0""B08_Attachment_08_GRTE_237343_-_WY_DEQ_Permit_Application_4-Lazy_F_NPS_signed_07_29_2026.pdf"1970733"file"".pdf""1""2026-09-21T22:07:35.33+00:00""23c9513fd751448c94de60af2ca11f1b""public""0""public""edec34318c654eaf9877612d4bc46f38""0"3"0""B08_Attachment_03_GRTE_237343_-_Combined_Asbestos_Report_999-5237.pdf"6792474"file"".pdf""1""2026-09-21T22:07:35.33+00:00""f51d7829f5674e71ad7afb55ba6dc42c""public""0""public""5a7545f81a9446a7b9592793ceb9331f""0"2"0""B08_Attachment_02_GRTE_237343_Specifications.pdf"16409022"file"".pdf""1""2026-09-21T22:07:35.33+00:00""cfce477359d94dada253e491fa12dd1d""public""0""public""e20cf2975bf84627a83d3e1d905a3f4d""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice cd66be4ac0da445eb1d3e9b4c97edcdf), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.