Amendment 0003 is issued to extend the due date for the Request for Quotation, revise CLIN descriptions for CLINs 0002 and 0006, and attach a revised price schedule. Deadline for questions remains closed. Future amendment is forthcoming with answers to questions that were timely received.
Amendment 0002 is issued to extend the Request for Quotation due date from 6 November 2026 to 18 November 2026, 12:00 PM PST and revise the period of performance start dates.
Amendment 0001 is issued to extend the Request for Quotation due date from 2 November 2026 to 6 November 2026, 12:00 PM PST.
The U.S. Army Corps of Engineers (USACE) at the Libby Dam Project (17877 Hwy 37, Libby, MT 59923) is modernizing its Main Unit Governors by replacing existing pressure switches with pressure transducers on five (5) units. The objective of this contract is to procure specialized governor control programming, Programmable Logic Controller (PLC) / Human Machine Interface (HMI) development, and commissioning support from the contractor to accommodate this hardware change. This is a turnkey requirement; the Contractor assumes full responsibility for understanding the existing system logic and delivering a fully functional, updated programming solution with no technical assistance from the Government.
Work shall be accomplished on a rolling outage basis as units become available, spanning from the Contract Award Date through August 30, 2027.
Work will occur across remote and on-site location, structured as follows:
Tasks 1 & 3 (Remote): Contractor's Facility.
Task 2 (On-Site Commissioning): Libby Dam Project, 17155 HWY 37, Libby, MT 59923-9703
Quoters must submit a Firm-Fixed-Price (FFP) quote for all contract line item numbers (CLINs). Incomplete quotes will be ineligible for award.
To be considered for award, interested parties must submit an email quote package directly adhering to the following rules:
E-mail Address: Quotes must be emailed to the Contract Specialist, Londres Medranda, at londres.medranda@usace.army.mil
SAM Registration: Offerors must have an active registration in the System for Award Management (SAM.gov) at the time of quote submission and maintain it through performance and final payment.
The Contractor shall provide all specialized engineering labor, travel, and remote support necessary to modify the pump logic for five units at the Libby Generating Station. The work consists of in-house development and testing (Task 1), on-site commissioning for the first unit (Task 2), and remote commissioning support for the remaining four units (Task 3). The Contractor shall evaluate and suggest I/O assignments for the new pressure transducers, provide a formal Field Service Report upon completion of on-site commissioning, and provide up to 12 hours of remote engineering support for the remaining units. The Contractor is solely responsible for accessing, analyzing, and documenting the baseline functionality of the existing governors prior to making modifications, and guarantees that the updated programming will replicate 100% of the legacy system's operational functionality, safety interlocks, and performance metrics. The Contractor shall provide all software tools, communication cables, and laptop interfaces required to connect to the PLCs and HMIs.
We post new architecture and design opportunities in Montana as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"98134-2329""SEATTLE""WA""USA""KO CONTRACTING DIVISION""4735 EAST MARGINAL WAY SOUTH""Atch 1-Revised Price Schedule _W912DW27QA003 Governor Control Programming.pdf"58206"file"".pdf""1""2026-11-18T17:09:24.15+00:00""9d7a8aef661f418c8b8fd3625132b735""public""0""public""1ad9aacbee524d82b3a2e996e84d69b8""0"5"0""Solicitation Amendment W912DW27QA0030003 SF 30.pdf"4011667"file"".pdf""1""2026-11-18T17:09:24.15+00:00""bcd97bed9480497295f9eba8ffd990f9""public""0""public""358163c0068b4480be574416dd169eaf""0"4"0""Solicitation Amendment W912DW27QA0030002 SF 30.pdf"4009765"file"".pdf""1""2026-11-06T18:25:50.671+00:00""da91f67079f74a358409d17fcb9f787f""public""0""public""ca1c586dacd84dd9afb34dce1dfe28db""0"3"0""Solicitation Amendment W912DW27QA0030001 SF 30.pdf"4009878"file"".pdf""1""2026-10-30T19:13:54.23+00:00""e4058c9df5f74950a07d47e10cf22884""public""0""public""85b6eaef4a7e40359cad0f00cc3263db""0"2"0""Solicitation - W912DW27QA003 Governor Control Programming.pdf"3246868"file"".pdf""1""2026-10-20T21:07:11.117+00:00""44586f9636a64d4283d166b0afe210a4""public""0""public""5e1a390c7b1549c9ad6e79e5e1872549""0"1"0"Most Montana work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice cc7d1c4591384282b7744333de20cdfc), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.