The Department of the Interior is soliciting quotations from eligible SBA 8(a) participants for a commercial requirement to furnish, deliver, install, and configure a flexible training/classroom solution at the Ohmsett Facility in Leonardo, New Jersey.
Interested quoters should review all attached solicitation documents, including the Request for Quotation (RFQ), Statement of Work (SOW), floor plan, and 2 video walkthroughs.
Furnish, deliver, assemble, configure and install high-durability collaborative training tables and ergonomic stackable seating for 45 to 50 people in an approximately 900-950 sq ft classroom, install surface-mounted perimeter electrical raceway with grounded AC, USB-A and USB-C charging outlets using existing building infrastructure without floor trenching or flooring replacement, and furnish and install six low-profile ceiling-mounted retractable power reels at Government-approved locations while preserving flooring and line-of-sight, including field verification, Government approval of layout, functional testing, debris removal and final acceptance.
We post new general contractors opportunities in Virginia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"B08_-_Video_2.mov"20279112"file"".mov""1""2026-11-20T17:21:36.244+00:00""297087e06bb64b6f99391a0853c3ac54""public""0""public""bd8f6e27fa4b495cadc006fd550fad65""0"4"0""B08_-_RFQ.pdf"362582"file"".pdf""1""2026-11-20T17:21:36.244+00:00""205a7c9cf4e441369edfe6fd0fb20336""public""0""public""f96505ba1f9e4c4a97c6a9e4a5a0d541""0"3"0""B08_-_R24_Floor_Plan-Ansi_C.pdf"99512"file"".pdf""1""2026-11-20T17:21:36.244+00:00""5ce55f4537124aa1bd651ac879fd21a6""public""0""public""332d01361c7047e9bd53b54e71bd9d42""0"2"0""B08_-_Video_1.mov"32479720"file"".mov""1""2026-11-20T17:21:36.244+00:00""d6e2215260b74a8291691d12aa99cca5""public""0""public""3178efce09274d8b8445b0772de5201e""0"1"0"Most Virginia work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice cb1634af91a34cc9b6cb7aceec6b756b), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.