We'll email you new flooring opportunities in Virginia as agencies publish them — free, unsubscribe whenever.
And get prequalified now, so the bond is never the scramble on the next one. Prequalify for bonding →
The U.S. Fish and Wildlife Service is seeking a contractor to provide all labor, materials, equipment, supervision, and incidentals necessary to perform interior painting and laminate/vinyl plank flooring installation at Warm Springs National Fish Hatchery, Warm Springs, Oregon. Work includes surface preparation, painting of designated interior quarters, removal of existing flooring, subfloor preparation, installation of new flooring, and disposal of all associated debris.
A site visit will be held on Tuesday, November 10, at 12:00 PM PST.
The contractor shall furnish all labor, materials, equipment, supervision, transportation, and disposal services necessary to complete interior painting and laminate flooring installation at Quarters #4, Warm Springs National Fish Hatchery. Interior painting includes surface preparation, priming, and painting of walls, ceilings, doors, trim, closets, hallways, stairwell, bathrooms, basement areas, and cold air returns using Benjamin Moore low-VOC paint or approved equal. Laminate flooring installation includes removal and disposal of existing carpet, carpet padding, tack strips, and related materials; subfloor preparation; installation of Pergo waterproof and pet scratch resistant laminate flooring or approved equal in the living room, dining room, hallway, hallway closets, entryway, stairs, and downstairs landing area; and installation of stair nosing, transition strips, trim accessories, and new baseboards where necessary. The contractor must also remove debris daily and perform final cleanup.
"Sol_140FF027Q0038.pdf"293882"file"".pdf""1""2026-11-03T20:19:34.496+00:00""a6fe9b9031874fefab087ff8c43c9061""public""0""public""8aa74ebe0c7f4fa9928afa356f512398""0"6"0""Attch1_A04_SOW_WarmSpringsPaint-Flooring_261103_5pp_Redacted.pdf"145589"file"".pdf""1""2026-11-03T20:19:34.496+00:00""6ae5a0bbf49a4a75a9b813fdb23f697a""public""0""public""40c9c179b0b44fb48c4ae0bb72b04b65""0"5"0""Attch3_DBA_OR-20260009_5pp.pdf"249623"file"".pdf""1""2026-11-03T20:19:34.496+00:00""bd3629975b9c4c25bfe46cc22e6eb7d8""public""0""public""7be890016f3548c981135ab13b4bf895""0"4"0""Attch2_Photos_8pp.docx"5050941"file"".docx""1""2026-11-03T20:19:34.496+00:00""59099e952055432ea754eb62f9416f3b""public""0""public""1d570cadb9134c06b38983b9ff87b288""0"3"0""Attch4_BidSchedule_1p.docx"20133"file"".docx""1""2026-11-03T20:19:34.496+00:00""919d59e6299e4e339d41782344e4ae48""public""0""public""b6ff087aab53497ea0a096b07206edd3""0"2"0""140FF027Q0038_TermsConditions_B-M_31pp.pdf"497864"file"".pdf""1""2026-11-03T20:19:34.496+00:00""2c942d5de48c43e0b33bb03acd3e260f""public""0""public""497239580f5347fe965b837bbe6ad37b""0"1"0"Most Virginia work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice ca659633cb194a6ca70777cd9e456198), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.