Purchase of a utility tractor to be used on the Enoree Ranger District for use on various forest
projects; wildlife opening planting, roadside mowing, and storm recovery efforts.
The USDA requires delivery of all items within 90 days of contract acceptance. Early deliveries will be accepted.
Note:
Please refer to Questions and Answers attachment before submitting new questions.
Shipping Instructions:
Delivery to address below:
USFS, Savannah River Site
1 Mile Inside Aiken Barricade
New Ellenton, SC 29809
Contact POC to coordinate delivery to a SECURE site.
The contractor shall provide a new, current year, 4x4 Wheeled Utility Tractor with attachments that meets or exceeds the following mandatory specifications: minimum 120 engine HP diesel, PowerQuad PLUS 16F/16R transmission, Mechanical Front Wheel Drive (MFWD) w/turnable fenders, rear wheels 19.5L-24in 10PR R4 BIAS, front wheels 12.5/80-18in 6PR I3 R4, closed operator station with certified ROPS, mechanical center link w/ball ends Cat2, greater than 93 l/min hydraulic pump, rear remote hydraulic connectors, three speed PTO 540/540E/1000, 3 point hitch with left hand adjustable lift link, and rear lift capacity 5,150 lbs. The tractor must include 3 mechanical stackable rear valves, 3 stackable mid SCV with mechanical joystick controls, and be required to fit attachments: Rotary cutter FC5012 and Front End Loader H310 NSL (though these attachments are not to be supplied by the contractor). Delivery is F.O.B. destination to USFS, Savannah River Site, 1 Mile Inside Aiken Barricade, New Ellenton, SC 29809 within 90 days of contract acceptance.
"US""US""303092449""Atlanta""GA""USA""1720 Peachtree ST NW STE 876S""C04- Questions and Answers.pdf"106472"file"".pdf""1""2026-11-19T12:46:31.653+00:00""e496efefa3a2448fbcb81b24fef91f90""public""0""public""38e1d6d902ed4c86a55bb02f86ab3f62""0"8"0""C04- Questions and Answers.pdf"51593"file"".pdf""1""2026-11-18T13:23:52.819+00:00""36d7a4db3d8a43c988d27982c47f316c""public""2026-11-19T12:46:31.653+00:00""1""public""d65d3b9eaa47498ab61650e0f7efc919""0"7"0""2026-11-19T12:46:31.653+00:00""Attachment 1- Solicitation Terms and Conditions SAM.pdf"813221"file"".pdf""1""2026-11-16T13:45:43.726+00:00""924d367c80c846369912d309e15e66f7""public""0""public""b9dded2496b04204af566b2b63175f8c""0"3"0""Attachment 2 - Specifications.pdf"876119"file"".pdf""1""2026-11-16T12:17:48.434+00:00""85a102379c7a46d2a4455283e36ab49c""public""0""public""e6c2969a1743401eb39af24a5d65a9fb""0"2"0"Most South Carolina work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice ca2317a71c6d4cbab448f7eb49cfab94), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.