ID- KOOSKIA NFH-OVERHEAD DOOR REPLACE
The contractor shall provide all labor, materials, equipment, and supervision necessary to remove three existing roll-up garage doors and install three new sectional overhead doors. Work includes demolition, disposal, installation, adjustments, testing, and site cleanup. Two additional electric door operators shall also be installed: one on the existing roll-up door in Bay #1 of the maintenance shop and one on the new East-facing roll-up garage door in the equipment storage building. The contractor must verify all field measurements and conditions before ordering materials, and all installation must comply with applicable codes and standards.
We post new garage opportunities in Virginia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"A04_SOW_KNFH_Garage_Door_Replacement_2.pdf"161071"file"".pdf""1""2026-11-10T23:31:26.993+00:00""4e83d4244f034563b507acfb60e521d6""public""0""public""b9852323c409499c9145bf2f56a7891b""0"1"0"Most Virginia work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice c4a7384545b941d8b11f7bd1c989dec8), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.