U.S. Army Reserve, 88th RD has an objective to reduce energy consumption, reduce energy cost, and increase energy resiliency of multiple facilities located in Minnesota and Wisconsin. The 88th RD is seeking to identify additional Energy Conservation Measures (ECMs) that provide measurable energy and cost savings. Potential energy and water saving projects may include but are not limited to: envelope improvements, insulation upgrades, window upgrades, LED upgrades, geothermal heat pumps, lighting, controls, renewable energy generation including photovoltaic solar arrays, retro-commissioning, water conservation measures, heating, ventilation, air conditioning (HVAC) upgrades including boilers, furnaces, split systems, and chillers, battery energy storage systems (BESS), and Hydrogen Fuel Cells and microgrids. Additional ECMs of interest include re-tuning; retro-commissioning and re-commissioning; building automation and control systems; window replacement; minor building-envelope improvements; domestic hot-water system replacement; plug-load analysis and reduction, including refrigerators and freezers; water-leak detection; and other water-efficiency upgrades. The project will evaluate these and other cost-effective opportunities to modernize facilities, improve energy and water resilience, and support the 88th RD long-term energy, water conservation, and resiliency goals (as determined by 88th RD and ARIMD). These efforts align with statutory requirements under 10 U.S.C. § 2911 for energy security and resilience, and 42 U.S.C. § 8287 through the Department of Energy’s (DOE) Fourth-Generation Energy Savings Performance Contract (ESPC) Indefinite Delivery Indefinite Quantity (IDIQ) contract.
Responses to this NOO must be received no later than 02 November, 3:00 p.m. (Ft. Belvoir, VA local time).
Responses must be completed and submitted to the following email mailbox: DLAEnergy-ESPC@dla.mil
The selected ESCO shall be responsible for evaluating the feasibility of an Energy Service Agreement (ESA) as part of an ESPC, developing a formal Preliminary Assessment (PA) and Investment Grade Audit (IGA), and implementing Energy Conservation Measures (ECMs) such as LED lighting retrofits, HVAC equipment replacements, building automation and control systems, photovoltaic and other renewable energy generation, window replacement, building-envelope improvements, domestic hot-water system replacement, plug-load analysis and reduction, water-leak detection, and other water-efficiency upgrades. The ESCO shall also be responsible for the operation, maintenance, repair and replacement of all installed ECMs for the life of the contract, and shall pursue all available credits, rebates, and incentives on behalf of the Government.
We post new general contractors opportunities in Minnesota as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"22060""FORT BELVOIR""VA""USA""ESPC AND RENEWABLES""8725 JOHN J. KINGMAN ROAD""Attachment 1 88th RD Building Data.pdf"84211"file"".pdf""1""2026-11-02T20:12:20.753+00:00""df964908592642528b3e1558cdf2669b""public""0""public""18ab634a6d9446a1a1a04aeca82a93c8""0"6"0""SF30-SP060427R0400 AMD 0003.pdf"84977"file"".pdf""1""2026-11-02T20:12:20.753+00:00""a99d458826b74dcbb8a98b8c6ebd0844""public""0""public""cd81d10a64ed4a0e8a6297592700237a""0"5"0""SF30-SP060427R0400 AMD 0002.pdf"205834"file"".pdf""1""2026-10-29T19:21:23.924+00:00""43400d286a064ae2b3732d40aabdcb77""public""0""public""86fa3654a4704ed29de5cfe1579d9534""0"4"0""SP060427R0400 NOO.pdf"177093"file"".pdf""1""2026-10-01T19:56:26.703+00:00""c3b3abcc898c418ab2db243b45ca72fb""public""0""public""05fc96daeded4da48657269233349cdb""0"3"0""SF30-SP060427R0400 AMD 0001_signed.pdf"644739"file"".pdf""1""2026-10-28T19:50:13.377+00:00""f33ffd69a9c645be901c4282ddcc866e""public""0""public""6236681994b2476fa6bdf68df67c9571""0"2"0""Attach 1 88th RD Building Data.pdf"1288211"file"".pdf""1""2026-10-01T19:56:26.703+00:00""c6bcd1ef22914ea3a7865516506d7c4c""public""0""public""b56bb50323544e6a85484fbe458fac0e""0"1"0"Most Minnesota work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice c2ada4a0f915497d88ca68a4cf4a371f), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.