KTR Questions 626-25-104_Garage Suicide Protection
The contractor shall furnish all labor, material, equipment, and supervision to accomplish the work for project 626-25-104 Garage Suicide Protection at the Tennessee Valley Healthcare System, VA Medical Center, Nashville, TN. Work includes demolition and new construction, including general construction, civil, architectural, electrical, low voltage, industrial hygiene, and certain other items. The base bid includes the full construction of proposed fall protection and lighting updates to all levels, including installation of fall protection on existing openings greater than 6' off grade and continuous fall protection along the top level, and updates to existing lighting including new lighting at main entrances. Alternate No. 1 deducts all lighting scope from the project.
We post new garage opportunities in Tennessee as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""37129""MURFREESBORO""TN""USA""VISN 9 CONSOLIDATED ACQUISITION""3400 LEBANON ROAD""S06 KTR Questions_36C24927B0002 0001_626-25-104_Garage Suicide Protection.docx"122177"file"".docx""1""2026-11-24T19:45:13.629+00:00""b1c0e540262d4a0e8c073ea0073ba4d8""public""0""public""bd954af8ab3f4debb783a5533f54f3fc""0"8"0""RFI Form.docx"17259"file"".docx""1""2026-11-16T12:46:35.761+00:00""2ca22f11aa9a4635855e28bb60918dc6""public""0""public""1e078cde58ce4c39a0cebe3255c4bcdf""0"7"0""UEI _ TAX ID.docx"13373"file"".docx""1""2026-11-16T12:46:35.761+00:00""b3659e65d1324f0386491da11b3f3d69""public""0""public""265a3b433d8648e7983481063ad1329e""0"6"0""Contractor EMR Certification Form.docx"16818"file"".docx""1""2026-11-16T12:46:35.761+00:00""08b5580a750c4238b54a1e14c00fbd30""public""0""public""eac7fb2a2a384f20bb4d343053db825b""0"5"0""Garage Suicide Prevention - Drawings.pdf"11775796"file"".pdf""1""2026-11-16T12:46:35.761+00:00""41bfc64f968e425c8d0527f69f40f698""public""0""public""dfb81a523c39400990fd0939c9d1381e""0"4"0""Garage Suicide Prevention_Specs.pdf"2769579"file"".pdf""1""2026-11-16T12:46:35.761+00:00""e1c7d90283874e1baff62c7963fd3063""public""0""public""a5d6b412db44420092a3acdf4006b659""0"3"0""Wage Determination_626-25-104_Garage Suicide Protection.pdf"257596"file"".pdf""1""2026-11-16T12:46:35.761+00:00""7c462f72dc6b46789a0ef00618be43ed""public""0""public""939f216d5b3e4e96abd84ea72cf307af""0"2"0""36C24927B0002_1.docx"540917"file"".docx""1""2026-11-16T12:46:35.761+00:00""72c6112fdce54d8785b8cfe93c2a871c""public""0""public""94cab6831e334730a0e796651cfa0040""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice c11fca225cc54a37bb5f8a06c1a43cb9), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.