Additional Info
NAICS = 333517
FSC = 3417
Location of Work: Cornado, CA
NO SET ASIDE
DLA Aviation Richmond intends to issue a solicitation to procure One (1) Computer Numerically Controlled (CNC) Large Vertical Milling Center.
Complete technical data package VIBB 27-40-1001 including minimum requirements for the CNC Large Vertical Milling Center as well as training, technical data, IUID tags, shipping, foundation, post processor, removal of existing equipment, rigging, and installation will be included as a part of the solicitation.
Request for Proposal SPE4A8-27-Q-0012 is anticipated to be issued on December 4, 2026, and close on January 4, 2027.
FOB will be at Destination. Inspection at Origin/Acceptance at Destination. The solicitation will be Unrestricted. Award shall result in a Firm, Fixed Price Contract.
Please email the solicitation package along with the compliance statement and descriptive literature to Roberta Anderson at Roberta.anderson@dla.mil.
A copy of the solicitation will be available via the DLA DIBBS website at https://www.dibbs.bsm.dla.mil/Solicitations/
Solicitations are in Portable Document Format (PDF). To download and view these documents, use the latest version of Adobe Acrobat Reader. This software is available free at http://www.adobe.com. A paper or e-mail copy of the solicitation may be provided to requestors on a case-by-case basis if access to DIBBS is not available.
Provide one CNC Large Vertical Milling Center meeting the minimum requirements of technical data package VIBB 27-40-1001, including training, technical data, IUID tags, shipping, foundation, post processor, removal of existing equipment, rigging and installation with FOB at Destination and inspection at Origin / acceptance at Destination.
We post new goods & materials opportunities in California as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"23297""RICHMOND""VA""USA""ASC INDUSTRIAL PLANT EQUIPMENT""8000 JEFFERSON DAVIS HWY"Most California work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice c06d4469853a4248aa1a66f53522263e), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.