This requirement is for two air compressor relocations for US Naval Research Laboratory (NRL). The full description and response requirements are included in the Request for Quotes (RFQ) N0017326Q1905 along with attachments. Your quick response is appreciated to facilitate an award prior to current fiscal year end.
A site visit is required before submitting any proposal or quote. The mandatory site visit is scheduled for Wednesday, October 7, at 9:30 am EDT at NRL. All visitors must notify NRL Contracts at least 2 days prior to the scheduled visit. If you are unable to attend on this date, another date may be requested, although the requested date/time may not be available. No change to the response date and time specified in Block 8 of the Standard Form (SF) 1449 will be granted based on an inability to visit NRL on the planned site visit day. Your quick response is appreciated to facilitate an award prior to current fiscal year end.
Amendment N0017326Q19050001 provides photos of the air compressors data plate information.
Amendment N0017326Q19050002 includes an additional site visit and extends RFQ response date.
Amendment N0017326Q19050003 removes the small business set aside, includes a site visit and extends RFQ response date.
Amendment N0017326Q19050004 provides additional photos, drawings, Government responses to questions received, and extends RFQ response date.
The contractor must relocate two existing air compressors from mechanical room 026B in Building 65 to a new exterior metal shed. Work includes providing a metal shed (approx. 10' x 21') on a concrete slab, extending 3" copper compressed air piping, extending compressor power with a 480V disconnect, providing a new 208V/120V panelboard, extending Siemens BAS wiring, providing a fire alarm system connected to Building 65, and installing interior insulation, exhaust fan, unit heater, lighting, and receptacles. One compressor must remain operational at all times; outages for relocation are limited to weekends with 30-day advance notice. The contractor must provide a construction-phasing plan, design submittals, and a project schedule.
"20375-5328""WASHINGTON""DC""USA""4555 OVERLOOK AVE SW""Solicitation Amendment N0017326Q19050004 SF 30.pdf"661420"file"".pdf""1""2026-10-15T11:47:03.73+00:00""22164c3d14764eb7a27616fc91c3f85c""public""0""public""77dccd00f0784bbdac58fb66453ba546""0"13"0""Attachment3_N0017326Q1905_Additional Photos.pdf"27135953"file"".pdf""1""2026-10-15T11:47:03.73+00:00""aca70624c2804d60aef2a9baab91036d""public""0""public""9c1452d1b0c34f32a11fac2704b4298b""0"12"0""Attachment4_N0017326Q1905_P275_NRL_Electrical_2025-02-25.pdf"131459131"file"".pdf""1""2026-10-15T11:47:03.73+00:00""06025ddc4e214981893d197b44e5f552""public""0""public""bead9966e1f34332b1459ae3ac0e0c2f""0"11"0""Attachment5_N0017326Q1905_P275_NRL_Fire_Pro_025-02-25.pdf"19349793"file"".pdf""1""2026-10-15T11:47:03.73+00:00""6f64753ee3764992bf951b9c7547bfbf""public""0""public""a37bfff463074156b454f3585371b861""0"10"0""Attachment6_N0017326Q1905_P275_NRL_Mechanical_2025-02-25.pdf"96194803"file"".pdf""1""2026-10-15T11:47:03.73+00:00""871336782e0947c69d45c7a5a43fd235""public""0""public""4a080dd6e3b7488bb8c0caab68390e5f""0"9"0""Attachment7_N0017326Q1905_P275_NRL_Plumbing_2025-02-25.pdf"26086773"file"".pdf""1""2026-10-15T11:47:03.73+00:00""8a16bd04eb454612b46f66d5cc333ea5""public""0""public""29420dd0c5a64ea8937d7dacd035186a""0"8"0""Solicitation Amendment N0017326Q19050003 SF 30 (1).pdf"581624"file"".pdf""1""2026-09-30T16:32:48.969+00:00""48f509a6b3d743fe8a3ac3fb652199c8""public""0""public""eca1dadda49c49a39b79d485a3c4d35c""0"7"0""Solicitation Amendment N0017326Q19050002 SF 30.pdf"631968"file"".pdf""1""2026-09-22T19:25:39.797+00:00""6f6a69f5b9bb4c27971ad95596471a5d""public""0""public""a495c6b007ec4eb693e8ac7e14a6b425""0"6"0""Solicitation Amendment N0017326Q19050001 SF 30.pdf"638661"file"".pdf""1""2026-09-18T14:59:27.566+00:00""0dcdd350177d4d57b6c29d4d3305073e""public""0""public""ef6e95c3b43e420d879ab182e3c854af""0"5"0""Air Compressor Data Plates.pdf"4671292"file"".pdf""1""2026-09-18T14:59:27.566+00:00""c8f0f93dd09e4a598f90fd758a3f6c66""public""0""public""799ef4bcb7a84fed83bb8cfc361b6a76""0"4"0""Solicitation - N0017326Q1905.pdf"1835001"file"".pdf""1""2026-09-14T13:09:18.869+00:00""1bf366f7bf7d4042ababc09dc13aaf50""public""0""public""0862f932f4f9463184dc0f108e33a3bd""0"3"0""Attachment1_N0017326Q1905_B65 Air Compressor Relocation_SOW.pdf"260023"file"".pdf""1""2026-09-14T13:09:18.869+00:00""b56ceed54ed54b42846032cf342c3f27""public""0""public""153940f69fad40ac835b867129b48911""0"2"0""Attachment2_N0017326Q1905_Conceptual drawing_schematics_photos.pdf"6869923"file"".pdf""1""2026-09-14T13:09:18.869+00:00""d13cd6ee519a4cae849d302421932088""public""0""public""e638476d10bf4e60983c08e31534c911""0"1"0"Most Washington, DC work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice be1c126307e7423ba4ac747416a62561), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.