Wilmington VAMC Roof Replacement
**Site Visit: September 15th, 11:00AM; Meet in building 10 Conference room **
** IFB Bid Opening: November 4th, 2026 11:00AM **
The contractor shall remove and dispose of all existing roofing material and insulation to expose the decking on Roofs 3D, PT, 10, and 11. Prep steel and concrete decking and brick walls to receive new roofing; fill voids and abandoned roof curbs. Repair all roof drains to original interior diameter using permanent methods, not insertable retrofit drains. Install new roofing to slope to drains with no ponding after rainfall. Upon exposure during demolition, immediately notify COR of any rusted, deteriorated, or structurally unsound metal decking; replacement only in COR-approved areas. Install 60 mil Elevate RubberGard EPDM LS-FR (or equivalent) fully adhered membrane, tapered insulation to R-33 average minimum (R-10 minimum at any location), HD cover board, and new pipe collars and flashing around existing penetrations. System must meet high wind zone design per IBC Section 1504 and 1609 and ASCE 7, with performance verified per ANSI/FM 4474/UL 580/UL 1897. Install new perimeter edge metal, coping, fascia, and counterflashing on all four roofs. Provide before, during, and after construction photographs. Implement waste management plan diverting construction and demolition materials per Section 01 74 19.
We post new roofing opportunities in Delaware as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""15215""PITTSBURGH""PA""USA""1010 DELAFIELD ROAD""Roof Replacemnt Roof Specs 1 460-26-004.docx"14706"file"".docx""1""2026-10-20T12:21:02.657+00:00""a34a490547fb4b548750501c4a256bbb""public""0""public""feff4703e44c48c9a4976dfc7e9cc530""0"18"0""RFI Answer 1 Roofing Replacement 460-26-004.docx"27830"file"".docx""1""2026-10-20T12:21:02.657+00:00""7e5f510120484458b7586f2022dfb963""public""0""public""ec408143fe3a45e6ac35695a8c94b8a9""0"17"0""Metal Decking Spec 460-26-004.docx"40833"file"".docx""1""2026-10-20T12:21:02.657+00:00""b40d44c0d3164f789d56d257601368b6""public""0""public""a122fdce5e1846819f36832c84b3e250""0"16"0""36C24426B0015 0005.docx"121481"file"".docx""1""2026-10-20T12:21:02.657+00:00""fc74f5b6523245fa832085a7b6f08678""public""0""public""e7ae40895b064ce2b8731d319c84ebf6""0"15"0""S06 36C24426B0015 0004.docx"121372"file"".docx""1""2026-10-06T17:47:20.404+00:00""b2bb91471fe24eb8bfcbe49d71d5c594""public""0""public""ed46977a35db40c8bddaac246cb8aa71""0"14"0""Wilmington_VA_Roof_RFI_Responses 9-26.pdf"180142"file"".pdf""1""2026-09-14T13:32:15.563+00:00""4f5d6dd9a39e4935b102e7cbbf2e09a0""public""0""public""6d628d8a0cc2487e8caa5cd8ef64db4f""0"13"0""Roof Replacement Teams Meeting.docx"14929"file"".docx""1""2026-09-14T13:32:15.563+00:00""b314aad163124fa58ae96390dc81842a""public""0""public""e1584da7ed7a40418bce195727af5579""0"12"0""36C24426B0015 0003.docx"120857"file"".docx""1""2026-09-09T16:19:23.93+00:00""fb796988849d4f5590237d497d041e95""public""0""public""392522fef91645d09c7c6fbde5fccda5""0"11"0""36C24426B0015 0003_2.docx"25129"file"".docx""1""2026-09-09T16:19:23.93+00:00""b5ffdf12a7af434d88f0906b0d1b07c5""public""0""public""278e6fbe14e74290bdffaa5cb62b65bc""0"10"0""36C24426B0015 0001_2.pdf"178199"file"".pdf""1""2026-08-14T11:55:45.975+00:00""2a14da02c3e54f5098b400fbcbcf69b1""public""0""public""52f5906775e84330b4b9cdcc06288aa8""0"9"0""SOW Roof Replacement 3D PT Roof 10 Roof 11 updated 01.pdf"154786"file"".pdf""1""2026-08-14T11:55:45.975+00:00""bdd99b6925cc432e96a196cc5ec06028""public""0""public""77518eaf8374401caf0d5c5320dd80ee""0"8"0""Attachment 1 Screen Shot Roof Replacement 3D PT 10 and 11.pdf"110580"file"".pdf""1""2026-08-14T11:55:45.975+00:00""c564b3d1313440249017762228508969""public""0""public""0fb3369cd8bc4a119b26febadbcc242b""0"7"0""Attachment 2 Screen Shot Roof Replacement Screen Shot.pdf"164977"file"".pdf""1""2026-08-14T11:55:45.975+00:00""06813afd4be74d3680097c8c94c70b63""public""0""public""be706824f7fb467da6a2813421f70607""0"5"0""460-26-004 Wilmington VAMC Roof Replacement Bid Opening.pdf"39815"file"".pdf""1""2026-08-14T11:55:45.975+00:00""f7d3dc59fd0e4854b33f3c27feeff570""public""0""public""52634bb0e3a74929b36b5a7ba5b57046""0"1"0"Most Delaware work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice badd7126ba3d48de8d8fed64ede193d5), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.