Water Treatment Services Site Visit
Contractor shall provide all labor, materials, equipment, chemicals, software, and supervision to deliver water treatment services at two locations. At Sepulveda Ambulatory Care Center (SACC): treat three firetube boilers, three Trane chillers, four cooling towers, 32 pot feeders; perform monthly chemical top-offs and verification, annual condenser and boiler inspections, monthly controller calibration, annual cooling tower cleaning, quarterly Legionella validation testing with action thresholds, annual disinfection, corrosion coupon testing, lab analysis, and monthly service reports. At Los Angeles Ambulatory Care Center (LAACC): treat three hot water boilers, three York chillers, four cooling towers, one pot feeder; perform monthly chemical maintenance, twice-monthly controller calibration, annual inspections, twice-annual disinfection, quarterly Legionella testing for building systems, corrosion coupon testing, and monthly reports. Both locations require web-based software for daily testing logs and service reports with continuous VA access, training for engineering teams, loaner equipment support, free pickup of empty chemical containers, Legionella validation reports and certificates, lab analysis reports, and water testing reagents and equipment as needed. All work must comply with VHA Directive 1061, ANSI/ASHRAE Standard 188-2021, VHA Engineering Standard ES-2019-001, CDC guidance, OSHA, EPA, and state regulations; corrosion rates must maintain carbon steel ≤3.0 mpy and copper ≤0.2 mpy; Legionella action thresholds: <10 CFU/mL no action, 10–999 CFU/mL review and remediate with retest in 3–7 days, ≥1,000 CFU/mL disinfect and drain/flush/clean per ES-2019-001.
We post new appliances opportunities in California as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""90815""LONG BEACH""CA""USA""4811 AIRPORT PLAZA DRIVE""SUITE 600""S06 - Site Visit Invitation 36C26227Q0121 0001.pdf"89635"file"".pdf""1""2026-11-18T00:40:07.764+00:00""93bb53a3a43b4c799ed392b683760aff""public""0""public""7ab654d1e46d4524906386c3c2715539""0"2"0""S02 - RFQ Water Treatement Services 36C26227Q0121.pdf"549766"file"".pdf""1""2026-11-16T20:37:40.783+00:00""05a747e20c18413b8633818f6eeff8cb""public""0""public""45ac1b0aa17d4df695356cf971b411dd""0"1"0"Most California work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice ba5375b8a19b4c95944541c30c918a70), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.