See Amendment and Attachments.
The contractor must clean, inspect, test, and re-fuel nine underground diesel fuel storage tanks, each with a nominal capacity of 20,000 gallons. Work includes fuel transfer, tank opening, sludge removal, fuel polishing, pre- and post-work fuel sampling and laboratory testing, reassembly, diesel fuel replenishment with ASTM D975-compliant No. 2-D S15 ULSD red-dyed diesel, and operational testing. The contractor must comply with Lockout/Tagout, permit-required confined-space entry, atmospheric testing, spill prevention, and environmental protection requirements. Work shall proceed one tank at a time, and each tank must be returned to operational status by the end of the scheduled workday unless a written exception is approved. The contractor must submit a detailed project schedule within ten calendar days after award and coordinate mobilization with the COR.
We post new chemicals & industrial supplies opportunities in California as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""95655""MATHER""CA""USA""10535 HOSPITAL WAY""Underground Fuel Tank Q and A 11.02.26.pdf"2330891"file"".pdf""1""2026-11-02T19:25:08.725+00:00""5c4c07b3fc9641c29116b545b5a771a4""public""0""public""8432abee1aa247f9ad6f3efab0870080""0"5"0""36C26127Q0089 0001.docx"27903"file"".docx""1""2026-11-02T19:25:08.725+00:00""763ae9d1c1d543f1921dd6c98531169f""public""0""public""3a598acd22274b4bbd221dc5c73e14c0""0"4"0""QUALITY ASSURANCE SURVEILLANCE PLAN.docx"42631"file"".docx""1""2026-10-23T13:56:16.43+00:00""1b936cb824b14e4ca015e3b7d5222774""public""0""public""08d0f3263e054726846dbd032609ea1a""0"3"0""WD 2015-5593 REV 33 08.27.26.pdf"4294317"file"".pdf""1""2026-10-23T13:56:16.43+00:00""4b3d55ea2e76479c9da634ac3b94eb19""public""0""public""8db2f87befcf49c6a07409227ae73ec6""0"2"0""36C26127Q0089.docx"1561929"file"".docx""1""2026-10-23T13:56:16.43+00:00""e798905fafe64df08c3d212b952dc20e""public""0""public""35f16124db8047ebb25dd724446bcabc""0"1"0"Most California work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice b77fd2a42566414d9a26fc1c0f2695f3), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.