DESCRIPTION OF WORK: The contractor to provide all necessary materials, equipment, personnel as necessary to perform Dockside repairs to the U.S. Coast Guard Cutter USCGC OAK (WLB 225 B) FY27 Dockside Availability 225’ Buoy Tender homeported Naval Station Newport, RI all in exact accordance with this solicitation and the attached specification. See Attachment 2.
QUOTATION DUE DATE: Your quotation must arrive no later than **12/10/2026 **at 2:00 pm Eastern Time; Quotations should be sent via electronic mail (e-mail) to Arlene.d.wright @uscg.mil and Sandra.a.martinez@uscg.mil.
The contractor must provide all necessary materials, equipment, and personnel to perform dockside repairs on the USCGC OAK. The work includes 35 work items such as: cleaning and inspecting fuel, hydraulic oil, and potable water tanks; cleaning and inspecting compressed air receivers and system valves; inspecting and servicing hydraulic and mechanical chain stoppers, crossdeck winches, hydraulic inhaul winch, warping capstan, single point davit, Welin Lambie dual point davit, commissary hoist, and buoy crane; cleaning and flushing grey water and sewage piping; replacing non-buoy weather deck LED flood lights; renewing weathertight doors and quick acting watertight hatches; renewing galley supply fan and pre-heater; renewing weather deck kickpipes; preserving compartment decks; renewing interior wet deck covering, carpeting, and sealing wet/dry deck covering; renewing main mast and jackstaff guardline staples; renewing gooseneck ventilation; and providing temporary services. The work also includes fire prevention requirements and general requirements for preservation, welding, environmental protection, and quality assurance.
We post new goods & materials opportunities in California as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"70ZU0227QIBCT0004 FY-27 CGCOAK DOCKSIDE.pdf"483897"file"".pdf""1""2026-11-17T16:22:34.249+00:00""6f16156db3f344b992eadbeedaae25f2""public""0""public""e0d664eedc0349fcbeb12d6cde22aec6""0"7"0""70ZU0227QIBCT0004_CGC OAK.pdf"192394"file"".pdf""1""2026-11-17T16:22:34.249+00:00""d020cb3bd4994dc1919b725f5b131991""public""0""public""6edc9dabd6494425958e8e7a5a17d626""0"6"0""70ZU0227QIBCT0004 FY-27 CGC OAK DOCKSIDE.pdf"494055"file"".pdf""1""2026-11-16T17:00:04.343+00:00""f3a0b8e347174267942351bc6d032437""public""2026-11-17T16:22:34.249+00:00""1""public""9fbbbb62b60d47e0bcc342115184cec6""0"5"0""2026-11-17T16:22:34.249+00:00""ATTACHMENT 1 PRICING OAK (WLB 225B) BLANK.pdf"198283"file"".pdf""1""2026-11-16T17:00:04.343+00:00""a67bf58f178f4abe9d7a4f8a7d279c68""public""0""public""f9f7c297a126494dbe9f5a518dcfcfea""0"4"0""ATTACHMENT 2 OAK Specifications (WLB 225B) DS FQ2 BGW 26 Rev 0.pdf"2558710"file"".pdf""1""2026-11-16T17:00:04.343+00:00""0108b145b3c04cf89dbf3bafa92c73f8""public""0""public""b857362730f04d4c898ee09e72df3516""0"3"0""ATTACHMENT 3 Past Performance Information Form.docx"23288"file"".docx""1""2026-11-16T17:00:04.343+00:00""f5da6e55eb324b31a99dbed6aba572fa""public""0""public""9c8341eee1c54edeb488ffd667341592""0"2"0""ATTACHMENT 4 Request for Clarification Form -CGC OAK FY27.docx"62976"file"".docx""1""2026-11-16T17:00:04.343+00:00""2efe5ecb19eb45548edcdcfd595c73a2""public""0""public""4df53447c6b64a71adca954de50ced8e""0"1"0"Most California work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice b643e7adf662440eb792a856c4abe493), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.