Mid-Term Availability (MTA) package for the USS LEWIS B PULLER for the Military Sealift Command (MSC). The package consists of ninety (120) work items (WI), including one (1) optional work item and seven (7) not separately priced (NSP) work items. The ship required Pire-side docking at the contractor’s facility .
Technical drawings and specifications will be provided upon request after the solicitation has been issued.
The work will be performed at the contractor’s facility located within Seventh Fleet AOR. The anticipated Period of Performance (POP) is from 1 June -16 July 2027.
The package consists of ninety (120) work items (WI), including one (1) optional work item and seven (7) not separately priced (NSP) work items. The ship required Pire-side docking at the contractor’s facility. Technical drawings and specifications will be provided upon request after the solicitation has been issued. The work will be performed at the contractor’s facility located within Seventh Fleet AOR.
We post new goods & materials opportunities as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"09834-0001""FPO""AE""USA""PSC 851 BOX 50"Most public work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice b3f83c4783c74f0db629e463dc6e292a), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.