**Amendment 0004 is issued to extend the Bid dues date to October 13, 2026, at 09:00 AM CDT, virtual bid opening will be at 2:00 PM CDT. This amendment will revise the wording on the price/schedule, provide clarification on several RFI responses, and include the asbestos report. No further RFIs will be accepted.
** Amendment 0003 is issued to extend the Bid due date to October 6, 2026, at 09:00 AM CDT. and to include the roof report and field observation report.
** Amendment 0002 is issued to correct the Price/Schedule table, include clauses, VAAR 852.219-73, FAR 52.232-5, and VA Specific Clause Payments Under Fixed Price Construction. Include responses to the requests for information, and to update the SOW with change to remove the existing solar panels. No further RFI’s will be accepted. Bids are due 9/29/2026 at 10:00 AM CDT. Virtual Bid opening will be held on 09/29/2026 at 2:00PM CDT, via the TEAMS link in the solicitation.
**Amendment 0001 to extend the bid date, include the site visit sign in sheet, and to re-word the price/schedule. See attached amendment.
This is an Invitation for Bid (IFB) for project 671-24-004 NRM Replace 2nd Floor Roof, located at South Texas Veterans Healthcare System (STVHCS) 7400 Merton Minter Blvd. San Antonio, Tx 78229.
The contractor shall furnish all materials, labor, tools, equipment, and transportation to complete the work for the base bid and all add-alternates as required by the SOW, drawings, and specifications. The base bid includes demolition and removal of the existing roofing down to the concrete deck in designated areas, installation of a new roofing system including a cold-applied vapor barrier, polyisocyanurate insulation, 5/8" gypsum cover board, and an adhered 80-mil fleece-backed TPO membrane. The work also includes removal, storage, and reinstallation of the existing lightning protection system with re-certification, and removal and disposal of all installed and stored solar panels, brackets, and associated equipment. Add-alternates include Penthouse Roof System Replacement, Replace Equipment Curbs, Replace Existing Treated Nailer and Blocking, and Replace Existing Metal Fascia. The contractor must also perform a site utility locate before demolition, provide as-built drawings, and comply with all security, infection control, and safety requirements.
We post new roofing opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""78240""San Antonio""TX""USA""5441 Babcock Road""Suite 302""Asbestos Survey.pdf"223153"file"".pdf""1""2026-10-01T18:47:46.099+00:00""8365e97c48174d5ca8456a4e73ee9baa""public""0""public""48b9991324644f7c8d289f0ac9cf5e42""0"14"0""36C25726B0004 0004.docx"172268"file"".docx""1""2026-10-01T18:47:46.099+00:00""dc6322dba02345598bbefa98902241d7""public""0""public""5f192a71678b4a1399786433ae8ecf96""0"13"0""VA AUDIE MURPHY ROOF REPORT Signed.pdf"1872729"file"".pdf""1""2026-09-23T20:20:18.42+00:00""7dc649ec9f454650b9a361fb49a1b766""public""0""public""42494042e3064c5dbdcf9de1c45b8a76""0"12"0""23040-VA-Replace_2nd_Flr_Roof_Uncovering-Field Observation Report-001.pdf"10512927"file"".pdf""1""2026-09-23T20:20:18.42+00:00""6f09d3f4aabf4f0299fe341de8994768""public""0""public""e474be39d96b4bdaba26fa0c3d98785f""0"11"0""36C25726B0004 0003.docx"120644"file"".docx""1""2026-09-23T20:20:18.42+00:00""5f7613a6cf3241ebb70947047825affd""public""0""public""2ade5454375e4981af849df4cc1edd9e""0"10"0""RFI final 26B0004.docx"780060"file"".docx""1""2026-09-15T18:42:38.964+00:00""8ac6a38545964a7b8232e02eb872197a""public""0""public""6011c53e45a346e89a5904118b01de31""0"9"0""36C25726B0004 0002.docx"136893"file"".docx""1""2026-09-15T18:42:38.964+00:00""664913990f9d4d28afd47cf1f54da593""public""0""public""66037d63a2764f3a9b568e812eae5f4a""0"8"0""36C25726B0004 0001.docx"128017"file"".docx""1""2026-08-27T19:48:49.144+00:00""6e7898ff80874a36a37794874ffc2315""public""0""public""89096d2a0cfb4fd09558d80437bde8c9""0"7"0""S06 Pre-bid sign in sheet.pdf"114338"file"".pdf""1""2026-08-27T19:48:49.144+00:00""298455a5c88749efa5a761f8bf3713fc""public""0""public""c135ee316bb341eeb6c72ec1873cbbf6""0"6"0""PCRA 671-24-004.pdf"567818"file"".pdf""1""2026-07-31T18:12:58.948+00:00""da7a8ec7441e4bb182a3129ee7634938""public""0""public""8d9631b4c4614ffeb3d4f623b0f06c8f""0"5"0""ICRA 671-24-004.pdf"398188"file"".pdf""1""2026-07-31T18:12:58.948+00:00""a6fce6eac07f4e6d971fab7e9edc055a""public""0""public""b74a68fb41864208b3c175757788d31e""0"4"0""671-21-143-VA-SA-Replace_2nd_Floor_Roof-Specifications.pdf"1199026"file"".pdf""1""2026-07-31T18:12:58.948+00:00""ad7b7d494a1141dc982d3920f5a64655""public""0""public""25bc1859180c4c43b0d2c326c16f11ab""0"3"0""671-21-143-VA-SA-Replace_2nd_Floor_Roof-Drawings.pdf"8693403"file"".pdf""1""2026-07-31T18:12:58.948+00:00""d1924d23d4424f72ba2a384eb7b02ff0""public""0""public""8c26b7eda74848bba5565c4878bccbc8""0"2"0""36C25726B0004_1.docx"128327"file"".docx""1""2026-07-31T18:12:58.948+00:00""5278e56cc7ba4f6b952a71e62a143dd9""public""0""public""2a1edf835d2b465ba1e5d5067f01b5dd""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice b3747710b2404de18ab7bd705c0f8f51), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.