Please see attachment.
The contractor must furnish all supervision, engineering, labor, materials, and equipment to design, manufacture, shop test, and deliver two digital static excitation systems; remove two existing excitation systems; install, test, commission, and make ready for commercial operation two excitation systems, including floor repair and all appurtenances; conduct equipment model validation tests; provide final O&M documentation and as-built drawings; perform collector ring inspection; perform optional collector ring refurbishment; furnish and install new safety railings; perform all necessary concrete demolition and repair; and anchor all new equipment.
We post new electrical opportunities in Oklahoma as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"74137-4290""TULSA""OK""USA""KO CONTRACTING DIVISION""2488 E 81ST STREET""Presolicitation Notice_Tenkiller Hydropower Excitation System Replacement_22 Oct 2026.pdf"280158"file"".pdf""1""2026-10-22T15:23:06.915+00:00""dae0822d575c43078da4940a80d357f8""public""0""public""e226c624b8794682adcc76c329f8b511""0"1"0"Most Oklahoma work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice b0d094b653864bcdbd6e33059241f9ea), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.