P-210 Electrical Power Plant at Chabelley Airfield, Djibouti
Please see attachments.
The project includes constructing a power plant composed of six diesel generators (each 830 eKW, 1,038 KVA, 4,160 V) meeting Overseas Environmental Baseline Guidance Document standards, two fuel storage tanks, a fuel polishing system, fuel offloading and distribution, diesel exhaust fluid offloading with conditioned storage and distribution, and a steel-framed metal canopy over a concrete slab with containment. The primary electrical distribution system includes underground electrical infrastructure, substation switchgear, a paralleling PLC system, underground PVC conduit in concrete-encased duct banks, medium-voltage pad-mounted switchgear, and a pad-mounted transformer. The work is located at Chabelley Airfield, Djibouti, Africa.
We post new electrical opportunities in Virginia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"23508-1278""NORFOLK""VA""USA""6506 HAMPTON BLVD""Attachment_A_Base Access Memo.pdf"164712"file"".pdf""1""2026-10-21T17:58:44.505+00:00""66f0da5040ad4aa899beae5dff3cbbda""public""0""public""ed23b1c4b36048c2b56b7576c8981b99""0"2"0""P210 Presolicitation.pdf"99928"file"".pdf""1""2026-10-21T17:58:44.505+00:00""2c7f06719925457c84246eb9bb53c24b""public""0""public""652fee89cc7c49bb941142e853a1a172""0"1"0"Most Virginia work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 6ef191a1b7a44deda314b1e98d3a35aa), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.