Light RFP
← All government bids
Federal · SAM.gov · Washington, DC

GPO G-Street Sidewalk Repair

Open — see notice·Electrical, Plumbing, Roofing, Paving / Sidewalks, Demolition / Abatement, FlooringView official posting ↗
Issuing agency
United States Government Publishing Office
Method
Presolicitation
Category
Construction · NAICS 238190
PIN
040ADV-26-R-0010
Location
Washington, DC
Posted
Apr 29, 2026
Takeaways by LightRFP AI

Generate a quick AI overview of this bid, pulled from its details and the attached documents.

Description

This is a pre-solicitation synopsis for a competitive solicitation that GPO intends to post on SAM.gov on or about May 11, 2026. The scope of work includes:

The concrete sidewalk and the vault structure beneath the G Street Sidewalk are showing signs of moderate to severe deterioration of the concrete and the encased structural framing. Over time and a failure of the waterproofing membrane, salt water, and other liquids constantly migrate into the reinforced slab and cause deterioration substantial damages.

The contractor shall provide the labor, material, equipment, and supervision to demolish and install the sidewalk slab and to repair and renovate the vaults beams, concrete slab, waterproofing membrane, and columns and other related structures to eliminate the water migration into the basement. All the work shall be in accordance with the design drawings and specifications prepared and submitted along with this statement of work. The contractor is required to obtain permits, traffic control plans, safety, and security approval prior to construction starting.

The contractor shall complete the following tasks as part of the project at the GPO G Street Sidewalk Repair:

Pre-Construction Tasks

  • Obtain all required permits and approvals.

  • Submit project schedule, safety plan, and traffic control plan.

  • Coordinate with GPO project management and stakeholders.

  • Conduct pre-construction meetings and site walkthrough.

Site Preparation & Demolition

  • Install temporary barriers, signage, and traffic control measures.

  • Set up designated staging and material storage areas.

  • Perform selective demolition of existing structures as required.

  • Ensure safe removal and disposal of construction debris.

Material Delivery & Logistics

  • Coordinate material deliveries in compliance with schedule.

  • Inspect and verify all materials upon arrival.

  • Store materials in designated secure areas.

Construction & Installation

  • Perform site grading and preparation, if applicable.

  • Install structural components, framing, and support systems.

  • Complete mechanical, electrical, and plumbing (MEP) installations.

  • Install architectural finishes, including flooring, ceilings, and walls.

  • Implement weatherproofing and insulation systems as required.

  • Conduct equipment and systems testing to ensure functionality.

Safety & Compliance

  • Maintain compliance with OSHA and other regulatory standards.

  • Implement and monitor safety protocols for workers and pedestrians.

  • Address any environmental concerns, including hazardous material handling.

Quality Control & Inspections

  • Conduct periodic quality control checks.

  • Submit required inspection and testing reports.

  • Address any deficiencies noted in inspections.

Project Closeout

  • Complete all final construction activities and finishing work.

  • Conduct a final walkthrough with the GPO project team.

  • Prepare and submit as-built drawings and O&M manuals.

  • Resolve punch list items and obtain final acceptance.

  • Restore site and remove temporary facilities.

  • Submit final project documentation, including warranties and certifications

Period of Performace is eighteen (18) months from Notice to Proceed.

A site visit will be scheduled and listed in the solicitation.

Documents1
SOW G Street Sidewalk.pdfPDF

Contact

Name
Troy D. White
Address
DC 20401
Full source recordfrom SAM.gov
Type
Presolicitation
Title
GPO G-Street Sidewalk Repair
Active
Yes
Base Type
Presolicitation
Notice Id
a6f3646f86b74f1889aafa0834d817cc
Naics Code
238190
Department
UNITED STATES GOVERNMENT PUBLISHING OFFICE
Posted Date
Apr 29, 2026
Point Of Contact
Type
primary
Email
twhite@gpo.gov
Full Name
Troy D. White
Type
secondary
Email
gstevens@gpo.gov
Full Name
Gary Stevens
Description Text
This is a pre-solicitation synopsis for a competitive solicitation that GPO intends to post on SAM.gov on or about May 11, 2026. The scope of work includes: The concrete sidewalk and the vault structure beneath the G Street Sidewalk are showing signs of moderate to severe deterioration of the concrete and the encased structural framing. Over time and a failure of the waterproofing membrane, salt water, and other liquids constantly migrate into the reinforced slab and cause deterioration substantial damages. The contractor shall provide the labor, material, equipment, and supervision to demolish and install the sidewalk slab and to repair and renovate the vaults beams, concrete slab, waterproofing membrane, and columns and other related structures to eliminate the water migration into the basement. All the work shall be in accordance with the design drawings and specifications prepared and submitted along with this statement of work. The contractor is required to obtain permits, traffic control plans, safety, and security approval prior to construction starting. The contractor shall complete the following tasks as part of the project at the GPO G Street Sidewalk Repair: Pre-Construction Tasks - Obtain all required permits and approvals. - Submit project schedule, safety plan, and traffic control plan. - Coordinate with GPO project management and stakeholders. - Conduct pre-construction meetings and site walkthrough. Site Preparation & Demolition - Install temporary barriers, signage, and traffic control measures. - Set up designated staging and material storage areas. - Perform selective demolition of existing structures as required. - Ensure safe removal and disposal of construction debris. Material Delivery & Logistics - Coordinate material deliveries in compliance with schedule. - Inspect and verify all materials upon arrival. - Store materials in designated secure areas. Construction & Installation - Perform site grading and preparation, if applicable. - Install structural components, framing, and support systems. - Complete mechanical, electrical, and plumbing (MEP) installations. - Install architectural finishes, including flooring, ceilings, and walls. - Implement weatherproofing and insulation systems as required. - Conduct equipment and systems testing to ensure functionality. Safety & Compliance - Maintain compliance with OSHA and other regulatory standards. - Implement and monitor safety protocols for workers and pedestrians. - Address any environmental concerns, including hazardous material handling. Quality Control & Inspections - Conduct periodic quality control checks. - Submit required inspection and testing reports. - Address any deficiencies noted in inspections. Project Closeout - Complete all final construction activities and finishing work. - Conduct a final walkthrough with the GPO project team. - Prepare and submit as-built drawings and O&M manuals. - Resolve punch list items and obtain final acceptance. - Restore site and remove temporary facilities. - Submit final project documentation, including warranties and certifications Period of Performace is eighteen (18) months from Notice to Proceed. A site visit will be scheduled and listed in the solicitation.
Full Parent Path Name
UNITED STATES GOVERNMENT PUBLISHING OFFICE.UNITED STATES GOVERNMENT PUBLISHING OFFICE.Acquisition Services
Place Of Performance
Zip
20401
State
Code
DC
Name
District of Columbia
Country
Code
USA
Name
UNITED STATES
Solicitation Number
040ADV-26-R-0010

Source: SAM.gov (notice a6f3646f86b74f1889aafa0834d817cc), retrieved via the SAM.gov Get Opportunities API. View the official posting — always confirm requirements and deadlines with the issuing agency.