Contractor shall provide personnel, management, tools, equipment, parts and materials, transportation and other items and services necessary to install eight (8) SIPR connections (4 user drop locations) for Bldg. T112 at Ft. Shafter, Hawaii. Contractor shall label all drops and equipment according to the NEC Standardized Labeling Program. Contractor shall abide by all TIA/EIA standards for Telecommunication installation.
**SECRET CLEARANCE REQUIRED **
Site Visit
19 Nov 2026 @ 1330, Fort Shafter Bldg T112
Site visit POC: Kyle Mishima POC Kyle Mishima (808) 787-0491
Site Visit (Apr 1984)
Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.
MEMORANDUM
DATE: November 17, 2026
TO: All Prospective Offerors
FROM: Contracting Officer, Automated Procurement Division
SUBJECT: Combined Synopsis/Solicitation for Commercial Services under FAR Part 12 and Part 13 Streamlined Procedures
This is a combined synopsis/solicitation for commercial services prepared in accordance with the format in FAR Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. This acquisition incorporates RFO streamlined procedures in lieu of utilizing Standard Form (SF) 1449.
Solicitation Number: W912CN-27-Q-A014
Solicitation Type: Request for Quotation (RFQ)
Contract Type: Firm-Fixed-Price (FFP)
Governing Regulations: The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Regulation (FAR) 2026-01 (effective March 13, 2026) and the Revolutionary FAR Overhaul (RFO) model deviation texts (effective July 1, 2026).
Set-Aside Typology: 100% Small Business Set-Aside
Applicable NAICS Code: 541519 – Other Computer Related Services
Small Business Size Standard: $34.00 Million
Estimated Value: Less than $350,000 (Below the Simplified Acquisition Threshold for services).
Trade Agreements Status: Exempt. Under FAR Case 2025-007 (FAC 2026-01), international trade agreements do not apply to acquisitions designated as small business set-asides.
Offerors must submit pricing for the following line items matching the Performance Work Statement (PWS):
CLIN
Description of Services
Quantity
Unit
Total Price
0001
Equipment for the installation of 8 SIPR drops for bldg. T112 (FS).
1
Job
$[Offeror to Enter]
0002
8 SIPR drop installation services for bldg T112 (FS).
1
Job
$[Offeror to Enter]
Total: $
Pricing must include all taxes and fees associated with the proposal
Description of Services: The Contractor shall provide all personnel, equipment, tools, and supervision necessary to perform commercial services as detailed in the attached PWS.
Period of Performance: 1 January 2027 through 30 April 2027
Place of Performance: Bldg T112 Fort Shafter
FOB Point: Destination
The following FAR Part 12 provisions and clauses apply to this acquisition and are incorporated by reference:
FAR 52.212-1 Instructions to Offerors—Commercial Products and Commercial Services
FAR 52.212-3**, Offeror Representations and Certifications—Commercial Products and Commercial Services** (Offerors must complete online representations at SAM.gov*)*
FAR 52.212-4 Contract Terms and Conditions—Commercial Products and Commercial Services
Award will be made to the lowest priced technically acceptable proposal which meets the requirements of the PWS and attached drawings.
Due Date & Time: Quotes must be received no later than December 08, 2026, at 11:59 PM HST.
Submission Channel: Electronic submissions must be emailed directly to the Contracting Specialist and officer at:
Chris Doyle – christopher.s.doyle.civ@army.mil
**Martin Celino – martin.a.celino.civ@army.mil **
Addendum Clause: Brief Explanation of Award (RFO-Updated)
(a) In accordance with updated streamlined commercial procurement procedures for acquisitions below $7.5 million, the Government will not provide a formal debriefing. Unsuccessful offerors may request a brief explanation of the basis for the contract award decision by submitting a written request via email within three (3) business days after receiving electronic award notification.
LAST DAY FOR SUBMISSION OF QUESTIONS IS 1 December 2026
Contractor shall provide all personnel, management, tools, equipment, parts, materials, transportation and other items and services necessary to install eight (8) SIPR connections (4 user drop locations) for Bldg. T112 at Ft. Shafter, Hawaii. Work includes installing red CAT6 copper cable in 1" EMT terminated into a new CAT6 patch panel; installing a new fire rated backboard in RM. 117; removing existing telecommunication equipment and moving the cabinet from Rm. 118; re-installing the existing CISCO 3850 POE switch and bonding it to a new Rear Bonding Bus Bar (RBB) using #6 AWG bonding cable; re-installing the existing Fiber Optic Patch Panel (FOPP); installing a new 6 strand Multi Mode Fiber Optic (MMFO) cable terminated with SC connectors; patching a new 1M Multi-Mode Fiber Optic Patch cord; installing a new L5-20 outlet; installing a new rack mounted Protection Distribution Unit (PDU); installing and patching a new Synergy PATCHBOX 365 CAT6A; installing a new 2-hole copper Rear Bonding Bus Bar (RBB); and labeling all SIPR and CENTRIXS drops according to the NEC Standardized Labeling Program. The system installation will be a turn-key solution.
We post new transportation & logistics opportunities in Hawaii as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"96858-5025""FORT SHAFTER""HI""USA""KO DIRECTORATE OF CONTRACTING""536 PALM CIRCLE DR BLDG T 122""T112 map direction.png"856762"file"".png""1""2026-11-18T07:46:22.903+00:00""f62362fe6ea14e3c8ec5f11605c8cacf""public""0""public""8168e32bf632402e876d96302358943d""0"3"0""T112_01.pdf"131417"file"".pdf""1""2026-11-18T07:46:22.903+00:00""b70eb6e4f2b74df384c901b264ddd843""public""0""public""56cc82ef0c8746a3a249ae4e1edc0175""0"2"0""FS T112 PWS SIPR drop.pdf"132726"file"".pdf""1""2026-11-18T07:46:22.903+00:00""53ea177aa3d141d7b65a73246df84ebd""public""0""public""d713127dda164b1d866ba80514fab665""0"1"0""FS T112 SIPR drop DRAWING.pdf"103282"file"".pdf""1""2026-11-18T07:46:22.903+00:00""c11f0aa5c8f64b19b6ca14a4c087b504""public""0""public""64fb915d483747ea8fefde95ab042472""0"1"0"Most Hawaii work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice a67b085ef1d64513a0ddf80426b1dda6), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.