CTX Chapel Window Repair / Replacement
The Contractor shall provide all labor, materials, tools, equipment, and supervision necessary to perform the removal and replacement of Chapel windows in Building 99. Work includes measurement verification, removal and haul off existing windows, preparation of openings, installation of new units, sealing, finishing, cleanup, and providing documentation upon completion. The contractor shall remove and reinstall window treatments as needed, move furnishings as needed to access windows, avoid interruptions in Sunday church services, reseal the existing stained-glass window, present an estimate for pre-approval to replace any unforeseen rotten wood, and remove and replace 7 damaged concrete lintels with rebar. All windows shall be double pane, picture frame fixed (non-functional) with Colonial Grids between the panes.
We post new windows opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""78240""San Antonio""TX""USA""5441 Babcock Road""Suite 302""Site Visit - Attendance Roster.pdf"391176"file"".pdf""1""2026-10-07T16:46:43.61+00:00""85e27a67a89f47978576884681a7d491""public""0""public""2c11a73d22a74778a4af1ff6a2d3ce82""0"6"0""Question and Answer for 36C25727Q0007 - CTX Chapel Window Repair - Replacement.pdf"224247"file"".pdf""1""2026-10-07T16:46:43.61+00:00""7d56f83e0cc045e4bb911952a4baf3da""public""0""public""0810f4f5e85a41d5a9028211c3115710""0"5"0""36C25727Q0007 0001.pdf"189232"file"".pdf""1""2026-10-07T16:46:43.61+00:00""6e4871b965be4fd9b4862e0dde02a354""public""0""public""5e029898f94645668d9b00c897b5e6fa""0"4"0""36C25727Q0007 0001_1.docx"15434"file"".docx""1""2026-10-07T16:46:43.61+00:00""36545245aee94cbda4aac3a755dc0508""public""0""public""a30647bc6dc0463f9fa4ec99164a7b23""0"3"0""RFQ 36C25727Q0007.docx"232682"file"".docx""1""2026-09-24T18:30:51.393+00:00""f6a544e2bd594438b1bb1a349eb0b9c1""public""0""public""389a3f28b4424ca296c41380e2b413b7""0"2"0""36C25727Q0007_1.docx"14393"file"".docx""1""2026-09-24T18:30:51.393+00:00""8a52e9ab853e462585e1890d096d14cf""public""0""public""1ed07cd7808a454aaaa5cb88b6ddd32f""0"1"0"Most Texas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice a4b10f2f624b4e9cac212abdc065db7f), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.