AML- Bridgeport (Tomes) Landslide
Addendum No 1 is issued to publish and distribute the attached information to the vendor community: 1. To publish vendor questions and answers 2. To publish Pre-Bid sign-in sheets 3. To publish revised specifications No other changes.
The contractor shall perform all operations necessary for mobilization and demobilization, survey and construction layout, quality control, site preparation including clearing and grubbing, access road construction, installation and maintenance of erosion and sediment controls, unclassified excavation/regrading/soil drying, traffic control, installation of drainage structures, road/laydown rehabilitation, soil capping, revegetation, and final site cleanup. Specifically, the contractor will excavate the main slide area to bedrock, install toe-key foundations, bonding benches, and underdrains, place excavated material in compacted lifts, install approximately 1,940 linear feet of riprap channels, and perform culvert and access road improvements. The contractor must also install temporary and livestock fencing, coordinate with the landowner, and comply with seasonal tree clearing restrictions (November 15, 2026 to March 31, 2027).
We post new asphalt opportunities in West Virginia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: State of West Virginia (wvOASIS) (solicitation ARFQ-0313-DEP2700000018-2), retrieved via the wvOASIS Vendor Self Service portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.