The goal of this Project is to provide permanent erosion repair and prevent future erosion of the existing Recycled Water (RW) Pond at the Western Water Recycling Facility (WWRF). The WWRF current average daily wastewater flow is around 1.5 MGD. Tertiary effluent from the plant is discharged to the recycled water storage pond. When the flow of recycled water exceeds irrigation demands, the excess treated water is stored in the existing pond until demand increases. The current storage pond capacity is 35 million gallons (MG).
Details
The project is divided into two phases. This first phase includes the improvements in the vicinity of the existing secondary effluent equalization basins. The allocated budget for this phase of construction is $1,500,000.
The second phase will be addressed seeparately and is not part of this project.
Notes
The recycled water is used for irrigation purposes and via irrigation pump stations is pumped to either:
· The General Old Golf Course (GC) and the Riverside National Cemetery (RNC) via an existing irrigation pump station (RNC&GC PS). This pump station is equipped with two pumps, each with a capacity of 850 gallon per minute (gpm), and operates based on pressure drop. The field results indicate that the station’s overall capability is believed to be 1,100 gpm (1.58 mgd. RNC is the largest single user of recycled/non-potable water.
· Western’s recycled/ non-potable water pump station system (RW/NPW PS) pumps into the U-2 system and operates based on the level of the Lurin Irrigation Tank (0.3 MG). This station is equipped with four pumps, each capable of 1,160 gpm. The station’s total capacity is believed to be 4,400 gpm (6.33 mgd).
Additional Details
Department: Engineering
Pre-Bid Meeting: September 23, 2026 at 1:00 PM
Q&A Deadline: October 7, 2026 at 2:00 PM
Liquidated Damages: $1,200/day
Required Submittals: Line Items, Comleted Bid Forms, Bid Bond, General Attachment (optional)
The goal of this Project is to provide permanent erosion repair and prevent future erosion of the existing Recycled Water (RW) Pond at the Western Water Recycling Facility (WWRF). The WWRF current average daily wastewater flow is around 1.5 MGD. Tertiary effluent from the plant is discharged to the recycled water storage pond. When the flow of recycled water exceeds irrigation demands, the excess treated water is stored in the existing pond until demand increases. The current storage pond capacity is 35 million gallons (MG). The project is divided into two phases. This first phase includes the improvements in the vicinity of the existing secondary effluent equalization basins.
We post new concrete opportunities in California as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s notice text — each row shows the sentence it came from. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
| Company | Contact | Location | Phone |
|---|---|---|---|
| AGC | Plan Room | Lakeside | 858-558-7444 |
| Bidding US | Adam Brown | Riverside | 951-555-0199 |
| Elka Construction incCADIR | Elia Kaleh | Temecula | 951-972-0806 |
| Engineering Remediation Resources Group, Inc. | Charles Wechsler | Martinez | 949-357-8536 |
| Environmental Construction, Inc.CADIR | Eric Gamonal | Woodland Hills | 818-449-8920 |
| Ferguson | jeff Stuart fox | Richmond | 804-363-8744 |
| GCLCCADIR | Jonathan De La Cruz | City of Industry | 626-601-3707 |
| GovGuide | Connor Fusselman | Arlington | 407-619-6738 |
| GSA Contract Services, LLC | Sarah Vine | Wilmington | 202-280-7019 |
| H L Hitchcock Construction IncCADIR | Hunter Hitchcock | Rancho Cucamonga | 909-518-5513 |
| Heed EngineeringCADIR | Ben Seyedin | Foothill Ranch | 949-300-2751 |
| Hoch Consulting ApcCADIR | Adam Hoch | Oceanside | 858-431-9767 |
| Hydrosprout, Inc | Danielle Tribby | Escondido | 760-432-8233 |
| Jeremy Harris Construction, Inc.CADIR | Jeremy Harris | Riverside | 951-215-0771 |
| KASA Construction, Inc.CADIR | Hector Zavala | Chino | 909-457-8260 |
| Levon Construction GroupCADIR | Telvis Artis | Anaheim | 562-673-5331 |
| Marina Landscape Inc.CADIR | Hue Ta | Orange | 714-939-6600 |
| Miller Equipment Co. Inc. | John A Baron | Lancaster | 661-945-2525 |
| Northern Digital, Inc.CADIR, MBE | Enrique Hernandez | Bakersfield | 661-322-6044 |
| Ortiz & Son, Inc.CADIR | Tiger Ortiz | Buena Park | 714-522-3994 |
| Vicon Enterprise IncCADIR | Telvis Artis | Anaheim | 562-673-5331 |
| Zusser Company, Inc.CADIR | Lara Sass | Los Angeles | 310-230-6808 |
Source: Western Municipal Water District (bid 145990), retrieved via the Western MWD PlanetBids portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.