OHLA USA, Inc., is bidding as Prime Contractor for the City of San Diego’s Alvarado Trunk Sewer Phase IV and Water Main Relocations Bid Package A and is requesting sub-bids from qualified, certified minority/disadvantaged subcontractors, suppliers, consultants and truckers.
Place of Performance: California
Performance Start: 1/30/2027
All work categories are open, including but not limited to: Sewer and water line construction; bypass pumping and highlining; water-main connections, cut-ins, cut-and-plug, abandonment, services, fire services/hydrants, valves and appurtenances; manholes, lining/rechanneling and frame/cover adjustments; sewer/water pipe and connection materials; trenchless construction/microtunneling; CCTV, pipeline and culvert inspection; geotextiles; clearing/grubbing; excavation/export, grading, potholing, trench shoring, bedding and backfill; aggregates, Class 2 aggregate base and crushed miscellaneous base; dewatering; contaminated water/soil monitoring, testing, sampling, handling, hauling and disposal; hazardous-waste plans/reporting; asbestos disposal; cold milling, pavement fabric, asphalt concrete, base, pavement repair/restoration, temporary resurfacing and saw cutting; minor concrete, flatwork, curb/gutter, driveways, bus pads, cutoff walls, ready mix, reinforcing steel and miscellaneous metals; painted/thermoplastic striping and markings, pavement markers and crosswalks; traffic control plans/devices; signal loops, pedestrian push buttons, detection systems and electrical; fencing/access; WPCP and erosion-control BMPs; landscaping, irrigation, hydroseeding, topsoil, shrubs and revegetation; biological, archaeological/Native American and paleontological services; community liaison and health/safety planning; surveying/monument adjustments; preconstruction video/date stamps; trucking, water trucks, street sweeping and equipment rentals.
We post new excavating opportunities in California as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most California work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: OHLA USA, Inc. (SUBNet), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.