- Docs
- Label
- Subsurface Utility Engineering Services 2027
- Kind
- services
- Due Raw
- 12/22/2026
- Pdf Docs
- 1
- Pdf Text
- Agency of Transportation Administration Division
219 North Main Street, Barre, 05641 Contract Administration
vtrans.vermont.gov Services Unit
November 19, 2026
Request for Proposals (RFP): Subsurface Utility Engineering Services 2027
The Vermont Agency of Transportation, hereinafter referred to as AOT, is seeking
consultant services in the development and/or construction of transportation projects.
The selected contractors shall be responsible for performing specific services or tasks
that include designating, locating, and other engineering assistance with regards to
underground utility facilities. The contractor shall provide all equipment, personnel and
supplies to perform the aforementioned services assigned by AOT.
This RFP will result in multiple awards.
Prequalification is not required in order to submit a proposal for this RFP.
Communication. AOT will not be bound by any oral communications. All questions
related to this RFP shall be sent in writing by email to the Point of Contact, noted
below. All questions and requests for clarification shall be received no later than 2:00
p.m. on Tuesday, December 8, 2026. All questions received will be documented and
answered after this date. Communication with other AOT personnel regarding this
RFP is prohibited and may result in the rejection of your proposal.
Point of Contact for this RFP: Caryn Pletzer
caryn.pletzer@vermont.gov
AOT Contract Administration Bureau
Services Unit
Proposal Assistance. If a Contractor requires assistance in preparing their proposal,
registering with SAM.gov, or needs guidance on socioeconomic certifications, the
Contractor may contact the Vermont Agency of Commerce & Community Development
(ACCD), Department of Economic Development (DED), APEX Accelerator. The
Vermont APEX Accelerator specializes in helping small businesses navigate the
documentation associated with State and Federal procurement. There is no cost to the
Contractor for assistance provided by APEX Accelerator. Their website is:
https://accd.vermont.gov/economic-development/programs/apex
Proposers’ Conference. There will not be a mandatory or optional pre-bid meeting.
Addendums / Modifications. In the event that it becomes necessary to revise, modify,
clarify, or otherwise alter this RFP, including AOT’s responses to questions and requests
for clarification, such addendum(s)/modification(s) shall be posted to the AOT Contract
Administration website.RFP Subsurface Utility Engineering Services 2027Page 1 of 109
IT IS THE PROPOSER’S RESPONSIBILITY TO OBTAIN ANY RFP MODIFICATIONS
ISSUED.
RFP modifications will be posted on the AOT Contract Administration website at:
https://vtrans.vermont.gov/contract-admin/bids-requests/services
Reservation of Rights. All proposals become the property of AOT upon submission.
The cost of preparing, submitting, and presenting a proposal is the sole expense of the
Proposer. Unselected proposals shall be securely disposed of at AOT’s discretion. AOT
reserves the right to reject any and all proposals received as a result of this solicitation,
to negotiate with any qualified source, to waive any formality and any technicalities, or to
cancel this RFP in part or in its entirety if it is in the best interest of AOT. This solicitation
of proposals in no way obligates AOT to award a contract.
Exceptions to Terms and Conditions. The proposer must state in the proposal any
exceptions taken to the terms and conditions in this RFP. For each exception the
proposer shall identify the term or condition, state the reason for the exception, and
provide any other information concerning the exception. Such exceptions, deviations, or
conditional assumptions may, however, result in rejection of the proposal as
unresponsive. Failure to note exceptions when responding to the RFP will be deemed to
be acceptance of the State contract terms and conditions. If exceptions are not noted in
the response to this RFP but raised during contract negotiations, the State reserves the
right to cancel the negotiation if deemed to be in the best interests of the State.
Multiple Award Anticipated. AOT intends to select more than one (1) Contractor to
perform these services under a primary contract. Each contract will contain a variety of
specific services the Contractor will be awarded. AOT will enter into contracts, with an
initial term of three (3) years with the option of extending for an additional three (3) year
period.
Maximum Amount. The maximum amount(s) for the contract(s) will be set at a level to
permit a Contractor to be awarded all work assignments if they are judged to be the
most qualified. Qualification Based Selection will be determined by experience,
specialists’ availability, required specialized equipment, capacity, creative ideas,
technical solution, and past performance. Award of a contract does not guarantee
payment of any or all the maximum amount. Payment is based on products or services
actually delivered or performed. The maximum amount for this contract does not
guarantee that the Contractor will receive any work under the Contract.
Work Orders. AOT may use several methods for determining and distributing work
orders to contracted Contractors including but not limited to requesting technical
proposals from more than one Contractor for comparison, requesting a proposal from a
single Contractor, or requesting proposals addressing more than one project. Award of
work orders will be a qualification-based selection when the services are design in
nature and federal funding is involved. Award of work orders will be a best value
selection when the services are not design in nature and federal funding is involved.
Best value selection will be used for all services that are 100% state funded, regardless
of service type.RFP Subsurface Utility Engineering Services 2027Page 2 of 109
Work Order Request (WOR) and Work Authorization Notification Process
• Specific tasks will be requested under this contract by the issuance of a Work Order
Request (WOR). Review of the WOR responses will determine who will be
selected. Once the 2nd tier solicitation is complete a Work Authorization Notification
will be issued via email from Contract Administration, Work Authorization Unit.
• VTrans will initiate this process by issuing a Work Order Request (WOR) detailing
the proposed task or projects and request a specific task technical proposal from
multiple CONTRACTORs awarded a Primary Contract. The Work Order Request
will also indicate which payment provision (hourly rate schedule, cost plus fixed fee
or firm fixed price) will be utilized for this task assignment. Detailed information
regarding the project will be included within the WOR. This request will be
completed by the CONTRACTOR and submitted by the identified due date.
• Upon evaluation and selection of the most qualified CONTRACTOR, a cost
proposal will be requested and provided to VTrans. VTrans reserves the right to
examine cost elements and negotiate the price prior to the award of the Work
Order. For Best Value 2nd tier solicitation, the cost proposal will be submitted with
the technical response and will be considered when determining best value
selection.
• When all aspects of the Work Order have been negotiated and accepted by both
parties, VTrans shall issue a Work Authorization Notification to the CONTRACTOR,
which will specify the effective date for commencement of services, agreed upon
cost and other important information.
All Work Order Requests that contain federal funding other than Federal Highway
Association (FHWA) such as Federal Railroad Administration (FRA), Federal Aviation
Administration (FAA) or other federal funding may contain special provisions required
for that federal funding and/or the particular project. By returning a work order proposal
for that project, you are indicating that you understand and will abide by any additional
provisions included in the Work Order Request/Authorization.
Primary Contract holders shall not enter into joint ventures with another Primary
Contract holder in response to a second-tier solicitation (Work Order Request); nor shall
it be permissible for a Primary Contract holder to include another Primary Contract
holder as a subcontractor.
Contractors who are awarded work orders will report to the assigned AOT Project
Manager. Work will be performed primarily at project sites and municipalities throughout
Vermont, as described in the work orders, and some meetings may be held at AOT
headquarters in Barre.
For subcontractors not named in the proposal, utilization of subcontractor personnel will
require written approval by AOT prior to the subcontractor performing any work under
the contract. Please see additional information regarding this process under the
subcontractor section within the Proposal Technical Format and Content.RFP Subsurface Utility Engineering Services 2027Page 3 of 109
No work may be performed after the expiration date plus exercised extensions of the
applicable Contract. In exceptional circumstances where it might be mutually desired to
have work extend beyond the term of a Contract, written authorization will be needed,
overseen by AOT’s Contract Administration, and authorized by the Secretary of
Transportation, the Agency’s Chief Financial Officer, other State Representatives as
required and Federal oversight agencies as required. A formal amendment will be
required for any such extension.
Confidentiality. Bidders are hereby expressly directed not to include any confidential
information in their proposal submissions, except as specifically identified in this RFP.
By submitting a proposal in response to this RFP, bidders acknowledge and agree to
abide by the terms and conditions outlined in this document, including the prohibition on
submitting confidential information. This prohibition reduces the burden on the State
while preventing bidder-confidential information from entering the public record. All
Proposals received will become part of the contract file and will become a matter of
public record, and may be disclosed to the public in accordance with the Vermont Public
Records Act, 1 V.S.A. § 315 et seq. If the proposal documents include material that is
considered by the proposer to be proprietary and confidential under 1 V.S.A. § 315 et
seq., the proposer shall submit a cover letter that clearly identifies each page or section
of the proposal that it believes is proprietary and confidential. The proposer shall also
provide in their cover letter a written explanation for each marked section explaining
why such material should be considered exempt from public disclosure in the event of a
public records request, pursuant to 1 V.S.A. § 317(c), including the prospective harm to
the competitive position of the proposer if the identified material were to be released.
Additionally, the proposer must include a redacted copy of its response for
portions that are considered proprietary and confidential. Redactions must be
limited so that the reviewer may understand the nature of the information being
withheld. It is typically inappropriate to redact entire pages, or to redact the
titles/captions of tables and figures. Under no circumstances can the entire response be
marked confidential, and the State reserves the right to disqualify responses so marked.
Please be aware that all contracts solicited and/or contracted through VTBuys will be
uploaded to the VTBuys Public Portal, wherein it can be viewed by any interested party.
Hourly rates and other cost proposal information included in Attachment B Payment
Provisions of the awarded contract will be viewable.
PROPOSAL INSTRUCTIONS
The quality of proposals and adherence to solicitation response requirements and/or
restrictions are considered reflective of the manner in which the proposer could be
expected to conduct business and will be given due consideration throughout the
evaluation process.
Failure to provide all required information or indications that the proposer did not conform to
all terms as set forth in the RFP and attachments may make the offer non-responsive and
may result in the elimination of the proposer from further consideration for award.RFP Subsurface Utility Engineering Services 2027Page 4 of 109
Proposals or unsolicited revisions submitted after the specified due date and time will not
be accepted and will be securely disposed of.
Required Electronic Submittal Information
Proposals will only be received electronically via an FTP site. In order to upload your
proposal, you must obtain a user account. This account will be provided when Contract
Administration receives your request via email. If you already have credentials, you still
need to request access to this specific RFP folder or you will be unable to submit your
proposal. Please submit your request for a user account by emailing the single point of
contact listed in this RFP above as soon as possible and no later than four (4) business
days before the RFP due date to ensure there is ample time to set up the user
account(s). The subject of the email should state “FTP Account Request for
Subsurface Utility Engineering Services 2027”.
You will then receive login credentials and guidance (in separate emails) for uploading
your proposal. If you are unable to submit your documents by uploading to the specified
FTP site(s), please notify the sole point of contact for additional guidance.
When submitting your proposal(s), please use the following naming convention:
ProposalType_CompanyName_RFPTitle
Examples:
• TechnicalProposal_ABCConsulting_SUEServices2027
• FinancialInformation_ABCConsulting_SUEServices2027
Note: the Financial Information document will be uploaded directly to AOT
Audit Section as these documents are considered confidential. You will
receive a separate user account through AOT Audit when this document is
required, and a user account is requested.
Submit your proposals via the provided FTP site prior to 2:00 P.M. on Tuesday,
December 22, 2026.
TECHNICAL PROPOSAL – FORMAT AND CONTENT
The proposal shall not exceed twenty-five (25) single sided pages. Sections that count
toward the page limit are noted below. All pages that count toward the page limit shall
be numbered consecutively. The pages shall be formatted as 8½” x 11” sheets. Font
shall be size 12.
The proposal shall include the following elements, in separately labeled sections, as
required.
A. Cover Letter. All proposers or their authorized representative shall prepare and sign
a cover letter. Submission of the letter shall constitute a representation by the
proposer that it is willing and able to perform the services described in the RFP and
their proposal response. This section counts toward the twenty-five (25) page
limit.RFP Subsurface Utility Engineering Services 2027Page 5 of 109
B. Technical Capability/Approach. In this section, the proposer must explain the their
understanding of AOT’s intent, objectives, and how the proposer proposes to
achieve those objectives. The proposer must discuss their experience, capabilities,
and plan for providing the described services, including any proposed approach to
project management, strategies, tools, and safeguards for ensuring performance of
all required services, and any additional factors for AOT’s consideration. This
section counts toward the twenty-five (25) page limit.
C. Business and Management Structure. Provide a description of the bidding
organization’s size, background, and structure, and a list of management personnel
by name and title. Indicate which management personnel will be responsible for the
delivery of services under the contract and a description of how the organization’s
resources will be applied. This section should provide clear information as to the
lines of communication and how the Business ensures Quality Control & Quality
Assurance. Include information as to how Local, Regional, and National Offices will
coordinate to provide successful services. This section counts toward the twenty-
five (25) page limit.
D. Organizational Chart. Provide a one-page organizational chart of the proposer’s
team that notes the name and title of key individuals that are proposed to manage or
perform tasks. This chart shall clearly indicate the lines of communication for
problem resolution. The use of an 11x17 page is permitted, however ensure that the
document has been scanned or saved appropriately so all information is included.
You may utilize a separate text box to contain the phone number and email of each
person listed on the chart, but the text box must be located on the same page as the
organizational chart. In the case of international or national firms, please provide an
organizational chart of the local office that will be responsible for the delivery of
services under the contract. This section DOES NOT count toward the twenty-
five (25) page limit..
E. Key Personnel. Identify the name and title of all personnel who will be assigned to
provide professional services under this contract. Indicate any certifications or
special licensing the individual holds that is pertinent. Include up to two-page
resumes for each individual. This section DOES NOT count toward the twenty-
five (25) page limit.
Note: Key personnel is defined as individuals or executives that hold critical roles
within a project. This includes those that have specialized expertise or knowledge,
leadership and accountability, strategic influence, and high impact on delivery of the
project. Examples include Executives, Senior Managers, Project Managers and
Senior/Lead Engineers, or other positions that require special licensing or
certifications.
The key personnel identified in the proposal are considered by AOT to be essential
to the work being performed under the contract. Prior to diverting any of the
specified individuals into other programs, the Contractor shall notify AOT in advance
and shall submit justification (including proposed substitutions) in sufficient detail to
permit evaluation of the impact on the program. No diversion shall be made without
AOT’s written consent.RFP Subsurface Utility Engineering Services 2027Page 6 of 109
F. Subcontracts. Identify all subcontracts proposed, and provide the following
information:
1. Company name of each subcontractor, or individual name in the case of
independent contractors;
2. Names of each subcontractor’s principals and/or corporate officers;
3. Resumes of each subcontractor’s key personnel who will be assigned to provide
professional services under the contract, including certifications or special
licensing for each; and
4. The types of work to be performed by each subcontractor.
This section DOES NOT count toward the twenty-five (25) page limit.
Note: Fully executed sub-agreements must be in place for each subcontractor prior
to the subcontractor performing any work under this contract. Any changes to or the
addition of new subcontractors are subject to the same notification and approval
procedures applicable to key personnel described above. Contractor must request
changes or additions in writing to the Contract Manager. The request shall include
justification for the change or addition, all required items such as resumes of the
subcontractor, a description of their services, any certifications or special licensing
the individual holds that is pertinent. All subcontractors that the proposer anticipates
utilizing under the contract should be included with the initial proposal. Changes to
subcontractors and the addition of new subcontractors should be the exception and
be on a limited basis.
G. Past Performance. Provide at least three (3) projects that detail past performance.
The projects must be completed in the past five years or currently in process which
are of similar size, scope, complexity, and contract type or otherwise relevant to the
work described in this RFP.
The proposer shall use the attached Past Performance and Reference Form
(Attachment Q).
The contact person must be able to speak knowledgably about the proposer’s
performance in both technical and business aspects. The contacts provided may be
directly communicated with at AOT discretion. The technical proposal shall not
include any quoted or summarized comments or recommendations from any in-state
or out-of-state evaluations, records, or reports of any kind. AOT reserves the right to
discuss the proposer’s past performance with any AOT employee who has had
experience with the proposer. This section counts toward the twenty-five (25)
page limit.RFP Subsurface Utility Engineering Services 2027Page 7 of 109
Required Certifications/Documents:
Fillable PDFs for the following forms have been provided as attachments to this RFP.
Sections 1-6 DO NOT count toward the twenty-five (25) page limit.
Section 7 counts toward the twenty-five (25) page limit.
1. Certification of Contractor/Consultant.
2. Certification Regarding Lobbying – All proposers must certify that no Federal
appropriated funds have been paid or will be paid to any person for influencing or
attempting to influence an officer or employee of any Federal agency or
Congress. Any such lobbying activities must be disclosed to the appropriate
Federal agency using Standard Form - LLL.
3. Debarment and Non-Collusion Affidavit – Form CA-91 – All proposers will be
required to execute a sworn statement, certifying that the proposer has not, either
directly or indirectly, entered into any agreement, participated in any collusion, or
otherwise taken any action in restraint of free competitive bidding in connection
with such contract.
4. Contractor’s EEO Certification – Form CA-109 – The certification is required
by the Equal Employment Opportunity regulations of the Secretary of Labor (41
CFR 60-1.7(b) (1)), and must be submitted by Contractors and proposed
subcontractors only in connection with contracts and subcontracts which are
subject to the equal opportunity clause.
5. Worker Classification Compliance Requirements (Self Reporting and
Subcontractor Reporting) – The form must be completed in its entirety and
submitted as part of the response for the proposal to be considered valid.
6. Contractor and Subcontractor Information Form – The form must be
completed in its entirety and submitted as part of the response for the proposal to
be considered valid.
7. Past Performance and Reference Forms
COST PROPOSAL – FORMAT AND CONTENT
Cost proposals are not requested as the contract and associated work orders will be
Cost Plus Fixed Fee. Individual cost proposals will be requested at the work order level.
CONTRACTOR FINANCIAL INFORMATION – FORMAT AND CONTENT
Submit one (1) separate PDF document (using the naming convention noted above),
containing:RFP Subsurface Utility Engineering Services 2027Page 8 of 109
A. Financial Documentation
1. The Proposer must have current 48 Code of Federal Regulation (CFR) Part 31,
and Federal Acquisition Regulation (FAR) Part 31 compliant financials on file with
the AOT Audit Bureau.
2. The financial information for the Proposer shall be for the most recently
completed fiscal year.
3. Financials shall include:
a. Cognizant Letter, if applicable
b. Current Audited FAR Compliant Financial Statements with Independent
Auditor’s Report
c. FAR Compliant Audited Schedule of Direct Labor, Fringe Benefits, and
General Overhead (OH), with Independent Auditor’s Report (In Excel
Format)
d. Completed AASHTO ICQ
e. Signed Certification of Final Indirect Cost Form
Forms and Resources can also be found here:
https://vtrans.vermont.gov/finance-admin/audit
4. Financial Submission Requirements: Firms are required to update Financials
annually and in Excel Format. Financials are due within 150 days of the close of
the firm’s fiscal year. Annual IDCR submissions are required in accordance with
FAR 52.216 7(2)(i) for audit and compliance purposes. The annual IDCR
submission is required even if/when billing rates for Hourly Rate and Firm Fixed
Price payment provisions are not up for renegotiation based on contract terms.
5. Confidentiality will be maintained in accordance with 23 USC § 112(b)(2)(E) and
23 FAR § 172.11(d).
6. Additional Resources:
• Code of Federal Registry 48 CFR Part 31
https://www.ecfr.gov/current/title-48/chapter-1/subchapter-E/part-31
• Federal Acquisition Regulations (FARs) Part 31
https://www.acquisition.gov/?q=/browse/far/31
• Sample FAR Auditor’s Report
• AF38 (Consultant Financial Background Questionnaire)
Any Proposer wishing to verify the status of their financial information should
contact the AOT Audit Bureau at AOT.audit@vermont.gov.
EVALUATION OF PROPOSALS
AOT will award a contract in the best interest of the State. The selection will be a
Qualification Based Selection.RFP Subsurface Utility Engineering Services 2027Page 9 of 109
The selection panel is comprised of AOT employees from varying Departments and
Bureaus and in some cases external interested parties. The panel members may or
may not be familiar with your company. With that in mind, it is important to provide
detailed information regarding the evaluation criteria listed below.
The selection panel will evaluate proposals based upon the following factors and related
sub-factors, which are of equal weight, unless noted otherwise:
1. Technical Capability/Approach
This section will be evaluated and rated at double (2x) the weight of the other
sections.
The proposal clearly indicates how the proposer will deliver timely, high-quality,
compliant, and cost-effective services to meet AOT’s needs. Specifically, the
proposal demonstrates:
• Demonstrated innovation on projects and assignments similar to those types
listed in the SOW.
• Ability to meet projects on time and within budget.
2. Business and Management Structure
• The proposal clearly demonstrates a sound organizational structure and
management approach which indicate positive business ethics, clear lines of
communication between the proposer’s team and AOT, active and continuing
participation of senior executives, a focus on quality assurance, and
partnering.
• The proposal clearly demonstrates that the proposer has the resources and
managerial capability to provide the required services in a timely, cost-
effective manner.
3. Key Personnel
• Proposer’s proposed key personnel are sufficient in number, experience, and
skill level, to provide high-quality professional services in a timely and cost-
effective manner.
• Demonstrates commitment of key personnel to tasks/assignments.RFP Subsurface Utility Engineering Services 2027Page 10 of 109
4. Past Performance
This section will be evaluated and rated at double (2x) the weight of the other
sections.
The past performance evaluation will examine how the proposer’s past and present
performance indicates the likelihood of successful completion of work under this
contract. In conducting the past performance assessment AOT may use data
obtained by references provided and any other source.
Evaluation Method
Ratings will focus on the strengths and weaknesses as demonstrated in the proposal.
Assigned ratings represent the consensus developed by the selection committee. Each
criterion described above will be scored according to the following chart.
The maximum possible evaluation score is 8+4+4+8=24
Explanation of Scoring Table:
Contract Award
Business Registration. The Contractor awarded a contract shall, upon notification of
award, apply for registration with the Vermont Secretary of State's Office in order to do
business in the State of Vermont, if not already so registered. AOT will not process the
contract until the Contractor is registered with the Secretary of State’s office and is in
good standing. The registration form may be obtained from the Vermont Secretary of
State: 128 State Street, Montpelier VT 05609-1101. The telephone number is 800-439-
8683. Registration can be completed online at: https://bizfilings.vermont.gov/homepage
Single
Max
Weight
Double
Max
Weight
Triple
Max
Weight
Overall Rating Description
4 8 12 Exceptional Indicates a proposal containing significant
strengths with few to no weaknesses
3 6 9 Very Good Indicates a proposal containing a number
of strengths but also some weaknesses
2 4 6 Acceptable
Indicates a proposal containing some
strengths but also some significant
weaknesses
1 2 3 Unacceptable
Indicates a proposal that contains
significant weaknesses that outweigh any
strengthsRFP Subsurface Utility Engineering Services 2027Page 11 of 109
Insurance. The Contractor shall submit to AOT a certificate of insurance showing that
minimum coverages are in effect. The certificate must be submitted to the office of
Contract Administration prior to execution of the agreement. No work may be
performed for any AOT contract and/or Notice to Proceed, including mobilization,
without compliant insurance being on file at AOT Contract Administration. It is the
responsibility of the Contractor to maintain current certificates of insurance on file with
the State through the term of the contract.
Workers’ Compensation. With respect to all operations performed, the Contractor
shall carry worker’s compensation insurance in accordance with the laws of the State of
Vermont.
NOTE: In the case of out-of-state Proposers, the proposer’s workers’
compensation insurance carrier must be licensed to write workers’ compensation
for all work that will be conducted within Vermont and so noted on the Certificate
of Insurance.
The Contractor will receive a contract via email. The Contractor must sign the contract
documents and return them to the Contract Administration Services Unit within thirty
(30) calendar days from the date of receipt. No contract shall be considered effective
until it has been fully signed by all parties. Failure to provide the signature page or
any other applicable forms within this timeline will result in delays with the
contract processing and may result in the loss of the award.
It is a condition of proposing under this RFP that, by submitting a proposal, the proposer
accepts and agrees unconditionally that if the proposer in any way contacts, or attempts
to contact, a member of the selection panel involved in the selection process for this
RFP, either during or following the RFP process, with the aim of communicating about
the selection process or outcome, then that proposer will be completely barred from
receiving or performing such work of the type covered under the RFP for a period of 365
days from the date of that proposer’s attempted contact with the selection panel
member. The only valid point of contact for questions about the process or outcome is
from Contract Administration and is specifically listed on the first page of the RFP.
Debrief. After notification of award, proposers may request a debriefing. The debriefing
will review the requesting proposers scores as well as strengths and weaknesses
identified by the selection committee during their review. The debriefing process is a
courtesy to the proposer and is not intended to provide information akin to that provided
in discovery procedures applicable in civil litigation or to replace processes for
requesting documents under the Vermont Public Records Act. Debriefing requests must
be submitted in writing via email to the sole point of contact within fourteen (14)
calendar days of notification of award results. Please include the names and e-mail
addresses of all employees of the proposer who wish to attend the debriefing.RFP Subsurface Utility Engineering Services 2027Page 12 of 109
Enclosures:
Attachment A: Scope of Work (SOW) dated October 2, 2026
Attachment B: Payment Provisions
Attachment C: Standard State Provisions for Contracts and Grants dated February
13, 2026
Attachment D: N/A – Left Intentionally Blank
Attachment E: Federal Railroad Administration (FRA) & Federal Emergency
Management Administration (FEMA) Provisions
Attachment F: General Terms and Conditions for Services Contracts
Attachment G: Federal Terms and Conditions for Services (Non-Construction)
Attachment H: Certification for Federal Aid Projects (DOT Form 272-040 EF)
Attachment I: AOT Civil Rights DBE Policy Contract Requirements CR110
Attachment J: US Department of Transportation Standard Title VI Non-
Discrimination Assurances (DOT 1050.2A): Appendices A and E
Attachment K: Certification of Contractor / Consultant
Attachment L: Certification Regarding Lobbying
Attachment M: Debarment and Non-Collusion Affidavit (Form CA-91)
Attachment N: Contractor’s EEO Certification (Form CA-109)
Attachment O: Worker Classification Compliance Requirements (Self-Reporting and
Subcontractor Reporting)
Attachment P: N/A – Left Intentionally Blank
Attachment Q: Past Performance and Reference Forms
Attachment R: Contractor and Subcontractor Information Form
Attachment S: N/A – Left Intentionally Blank
Attachment T: N/A – Left Intentionally Blank
Attachment U: N/A – Left Intentionally BlankRFP Subsurface Utility Engineering Services 2027Page 13 of 109
1
ATTACHMENT A
SCOPE OF WORK
SUBSURFACE UTILITY ENGINEERING (SUE)
– DESIGNATING, LOCATING AND OTHER SUE RELATED DESIGN SERVICES
October 2, 2026
I. GENERAL
The Vermont Agency of Transportation, hereinafter referred to as VTrans, is seeking
Consultant services in the development and/or construction of transportation projects. The
selected Consultant(s), hereinafter referred to as the Consultant, shall be responsible for
performing specific services or tasks that include designating, locating, and other engineering
assistance with regards to underground utility facilities. The Consultant shall provide all
equipment, personnel and supplies to perform the aforementioned services assigned by
VTrans.
Subsurface utility engineering, hereinafter referred to as SUE, can be applied to varying
degrees on a transportation project depending upon the situation. A project may include one
or multiple utility quality levels depending on the risk factor associated with each subsurface
utility facility. Subsurface utility data evaluation can be an important part of the project design,
utility coordination and SUE process. The following sections provide basic issues to consider
when determining what specific quality level to choose for a specific situation. The following
items are not intended to be comprehensive or exclusive; they are merely set forth as a
general outline of the work that is expected.
SUE – “A branch of engineering practice that involves managing certain risks associated with
utility mapping at appropriate quality levels, utility coordination, utility relocation design and
coordination, utility condition assessment, communication of utility data to concerned parties,
utility relocation cost estimates, implementation of utility accommodation policies, and utility
design” (this definition from CI/ASCE Standard 38-02)
CI/ASCE Standard 38-02, “Standard Guideline for the Collection and Depiction of
Existing Subsurface Utility Data” has been used as a guideline for the development of this
scope of services. It’s referred to as the industry “Standard” since it was prepared under the
“American Society of Civil Engineers (ASCE) consensus process making it the first nationally
recognized publication covering aspects of SUE. Depending on the specific project, the
Consultant may be asked to provide some or all the work identified in utility quality levels A
through D. (the following definitions are from CI/ASCE Standard 38-02)
Designating – “The process of using a surface geophysical method or methods to interpret
the presence of a subsurface utility and to mark its approximate horizontal position (itsRFP Subsurface Utility Engineering Services 2027Page 14 of 109
2
designation) on the ground surface.” It should be noted that the mark on the ground is not the
final product. The marks should be survey located, reduced onto the plans and reviewed by a
competent professional.
Locating – “The process of exposing and recording the precise vertical and horizontal location
of a utility.” Exposure is typically done using vacuum excavation techniques.
Utility Quality Level – “A professional opinion of the quality and reliability of utility information.
Such reliability is determined by the means and methods of the professional. Each of the four
(4) existing utility data quality levels is established by different methods of data collection and
interpretation”.
Utility Quality Level A
“Precise horizontal and vertical location of utilities obtained by actual exposure (or
verification of previously exposed and surveyed utilities) and subsequent measurement
of subsurface utilities, usually at a specific point. Minimally intrusive excavation
equipment is typically used to minimize the potential for utility damage. A precise
horizontal and vertical location, as well as other utility attributes, is shown on plan
documents. Accuracy is typically set to 15-mm vertical and to applicable horizontal
survey and mapping accuracy as defined or expected by the project owner”.
Utility Quality Level B
“Information obtained through the application of appropriate surface geophysical
methods to determine the existence and approximate horizontal position of subsurface
utility facilities. Quality level B data should be reproducible by surface geophysics at
any point in their depiction. This information is surveyed to applicable tolerances
defined by the project and reduced onto plan documents”.
Utility Quality Level C
“Information obtained by surveying and plotting visible above-ground utility features and
by using professional judgment in correlating this information to quality level D
information”.
Utility Quality Level D
“Information derived from existing records or oral recollections”.
The services requested for a particular project will vary according to the needs of VTrans.
Requested services could be a special engineering assessment or survey regarding
subsurface utility facilities within and/or adjacent to a design or construction project.
It is the policy of VTrans to use English units. In the event that an existing “shelf” project was
designated in metric units, the project shall be finalized for bid solicitation and construction in
metric units. All new projects are to be prepared in English units, unless otherwise instructed
by the VTrans Project Manager (VPM).RFP Subsurface Utility Engineering Services 2027Page 15 of 109
3
Due to the amount of traffic on certain highways, the Consultant may be required to perform
work during off peak hours. In addition, except with written permission, all work in the State
highway right-of-way shall be performed during normal daylight hours and shall cease on
Sunday, on all holidays (which included the day before and the day following), during or after
severe storms, and between December 1 and April 15.
II. CONSULTANT RESPONSIBILITIES
A – SUBSURFACE UTILITY DESIGNATING
Using geophysical prospecting techniques to determine the existence and horizontal position
of underground utility facilities.
1. Meet with VTrans staff to discuss specific project scope of work.
2. Provide proposal to VTrans on project; including estimated duration of work.
3. The Consultant shall not proceed with any work until VTrans has issued a “Notice to
Proceed” for a specific project assignment.
4. After written authorization is given to the Consultant by VTrans to perform these
services on a specific project the Consultant shall obtain all necessary permissions
and/or permits to allow the Consultant to work on existing highways and private
property for the purposes of marking, measuring, and recording the location of
existing underground utility facilities. This may include but is not limited to a Title 19
Vermont Statutes Annotated Section 1111 highway permit.
5. The Consultant will secure necessary plans, plats or other documentation from
VTrans and utility companies.
6. The Consultant will provide signs, safety devices and flaggers as specified by
VTrans.
7. The Consultant will designate, measure, and record the approximate hei
- Enriched
- Yes
- Pdf Pages
- 109
- Vtrans Id
- subsurface-utility-engineering-services-2027
- Cat Review
- At
- Nov 19, 2026
- Method
- openrouter
- Taxonomy
- construction
- Categorized By
- llm
- Questions Due Raw
- 12/08/2026