BRIDGE REPLACEMENT
Virginia Department of Transportation 09/08/2026Date Printed:
Schedule of Items Page: 2
Proposal ID: C0000120814B32 0066-030-543, B632
Order No.: A98
Oversight/State Project No.:
Federal Project No.: BFP-066-1(376)
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price
Approximate
Quantity and
UnitsDescription
Item ID
Proposal
Line
Number Dollars Cents Dollars Cents
Spec
No.
0010 108SP20-0001
BASELINE PROGRESS
SCHEDULE
LUMP SUM _________._____LUMP SUM
ATTD
0020 108SP20-0002
PROGRESS SCHEDULE
UPDATES
EA
30.000
____. ____.
ATTD
0030 301SD20-0001
CLEARING AND GRUBBING LUMP SUM _________._____LUMP SUM
301
0040 302SD20-0013
ENDWALL EW-12 EA
6.000
____. ____.
302
0050 302SD20-0027
15" STORM SEWER PIPE LF
180.000
____. ____.
302
0060 302SD20-0032
18" STORM SEWER PIPE LF
41.000
____. ____.
302
0070 302SD20-0041
24" STORM SEWER PIPE LF
69.000
____. ____.
302
0080 302SD20-0198
15" END SECTION ES-1 OR 2 EA
1.000
____. ____.
302
0090 302SD20-0204
24" END SECTION ES-1 OR 2 EA
1.000
____. ____.
302
0100 302SD20-0446
DROP INLET DI-5 EA
1.000
____. ____.
302
0110 302SD20-0456
DROP INLET DI-10H TY.
State Project: 0066-030-543, B632
UPC: 120814
Federal Project: BFP-066-1(376)
Route: 66
County/City: FAUQUIER
Engineer's estimate: $44,539,000.00
Let date: 11/18/2026
Begin: 0.280 Mi. W. Of Broad Run
End: 0.296 Mi. E. Of Broad Run
Showing: No Showing
Time limit: 5/21/2029
Last date to post questions: 11/13/2026
Q1: Stage 1 MOT widening (9/22/2026)
9/22/2026 4:33:10 PM Is it the intent to complete the full depth pavement section including undercut, geotextile, 21B subbase, 25 MM and 19 MM asphalt lifts for the stage 1 widening under night time lane closures?
Q2: Traffic Control Plan Phase 1 (9/17/2026)
9/17/2026 10:34:31 AM It seems Plan Sheet E(9) is missing from the uploaded set of plans. Please confirm.
Answer (9/18/2026): 9/18/2026 8:32:41 AM Confirmed. Sheet 66E(9) is included. Document labeled “A98_120814 Merged Road Plan.pdf” has been re-merged ensuring sheets are in the proper order. Question Date: 9/17/2026 10:39:34 AM Correction. It seems several plan sheets are missing from the Traffic Control Plan. Please provide. Answer Date: 9/18/2026 8:33:01 AM Confirmed Sheets 66E through 66E(25) are included. Document labeled “A98_120814 Merged Road Plan.pdf” has been re-merged ensuring sheets are in the proper order.
Q3: CADD Files (9/16/2026)
9/16/2026 8:42:21 AM Please release the microstation files as well as the .tin files with surface information.
Answer (9/17/2026): 9/17/2026 12:00:43 PM The microstation and .tin files are available in the document labeled “A98_120814 Microstation Files.set”.
Q4: As-built Drawings (9/16/2026)
9/16/2026 8:41:06 AM Please release the as-built drawings for the existing structure.
Answer (9/16/2026): 9/16/2026 2:59:34 PM As-builts are now available.
Q5: plans (9/14/2026)
9/14/2026 7:00:42 AM There are no bridge plans posted.
Answer (9/15/2026): 9/15/2026 12:24:17 PM Bridge plans have now been posted. Thank you.
Q6: Plans Uploaded to Projectwise (9/9/2026)
9/9/2026 1:02:31 PM The plans and supporting documentation do not appear to be uploaded to ProjectWise. Just the specs and geotech report. Please provide at your earliest convenience.
Answer (9/11/2026): 9/11/2026 1:09:15 PM These have been posted. Displaying questions 1 - 6 (of 6) Page: 1 First Previous Next Last Construction Advertisement Bulletin Board (CABB) Update Profile CABB v2.0 © 2008 Virginia Department of Transportation 9/22/2026 7:42:57 PM 2008
The work includes clearing and grubbing, storm sewer pipe installation, endwalls, drop inlets, regular and borrow excavation, check dams, dewatering basins, siltation control, inlet protection, temporary silt fence, select material, geotextile subgrade stabilization, cement stabilized aggregate, aggregate base material, asphalt concrete (various types), rumble strips, saw-cut asphalt, concrete bridge approach slab, reinforcing steel, structure excavation, select backfill, geocomposite wall drain, cofferdam, bridge substructure rock socket drilled shafts, standard excavation drilled shafts, crosshole sonic logging, temporary shoring, steel piles, preboring piles, concrete class A4 and A3, bridge deck grooving, cover depth survey, reinforcing steel, structural steel plate girders, bridge median barrier, concrete parapet, demolition and removal of existing structure, environmental and worker protection, material disposal, erosion control stone, dry riprap, NBIS access, underdrain, crossdrain, outlet pipe, curb, median barrier, guardrail installation and removal, fence, pavement demolition, flowable backfill, removal and modification of existing structures, traffic barrier, impact attenuators, barricades, temporary signs, truck mounted attenuator, channelizing devices, portable changeable message signs, electronic arrow boards, flagger service, pavement marking removal and installation, portable temporary rumble strips, police patrol, mobilization, field office, flexible pavement planing, construction surveying, temporary and regular seeding, overseeding, legume seed, hydraulic erosion control products, fertilizer, lime, sign structure removal and relocation, sign posts, concrete foundations, sign panels, and pavement markings.
We post new asphalt opportunities in Virginia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Virginia work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Virginia Department of Transportation (solicitation A98), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.