The Work under this Project generally consists of removal of existing pavements by milling, placementof bituminous concrete pavement, associated pavement markings, concrete entrance, sidewalk,curbing, detectable warning surfaces, and miscellaneous work, including but not limited to utilityframes and covers adjustments within certain public rights of way; such as Armistead Ave & PortAnne subdivision and municipal building parking area. This project will be locally administered bythe City of Williamsburg.
The work generally consists of removal of existing pavements by milling, placement of bituminous concrete pavement, associated pavement markings, concrete entrance, sidewalk, curbing, detectable warning surfaces, and miscellaneous work including utility frames and covers adjustments within certain public rights of way such as Armistead Ave and Port Anne subdivision and the municipal building parking area. The project will be locally administered by the City of Williamsburg.
We post new asphalt opportunities in Virginia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
["https://procure.cgieva.com/page.aspx/en/fil/download_public/0AA334C0-71AB-4E22-9758-5ECFF141FAFD"]["<a href=\"\"https://procure.cgieva.com/page.aspx/en/fil/download_public/0AA334C0-71AB-4E22-9758-5ECFF141FAFD\"\">IFB 08 4101 27 FY27 Citywide Street Resurfacing.pdf</a>"]["0AA334C0-71AB-4E22-9758-5ECFF141FAFD"]["IFB 08 4101 27 FY27 Citywide Street Resurfacing.pdf"]["1715020"]["10/5/26"]["IFB 08 4101 27 FY27 Citywide Street Resurfacing"]["RFx Document"]Most Virginia work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Virginia eVA (solicitation IV129503), retrieved via Virginia's eVA statewide eProcurement marketplace. View the official posting, and always confirm requirements and deadlines with the issuing agency.