Stage II Invitation to Bid
Only contractors who have been prequalified under a Stage I Prequalification for Contractors and are currently on the respective DFCM Prequalified Contractors list as of the date of this solicitation are eligible to bid on this project.
The State of Utah - Division of Facilities Construction and Management (DFCM) is requesting bids for the referenced project:
Project Description: Install new AC Split Systems in each wing of the Forensics Building.
Construction Cost Estimate: $200,000.00
Install new AC split systems in each wing of the Forensics Building, including eight roof-mounted outdoor units paired with sixteen indoor fan-coil units, refrigerant piping sized per manufacturer recommendations, 3/4-inch condensate drain lines terminating through exterior wall, new ductwork with ceiling diffusers and return grilles, raising or lowering existing ductwork as needed, cutting and patching hard-lid ceilings, providing ceiling access panels, aluminum-jacketed outdoor refrigerant piping, roof equipment platforms and line-set enclosures with waterproofing, plus electrical, controls with BACnet, testing, balancing and commissioning.
We post new architecture and design opportunities in Utah as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: State of Utah (Bonfire) (solicitation 256367), retrieved via the Utah Bonfire procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.