Only those contractors that were prequalified for the Multiple Mountain View Corridor Sewer Projects may bid on this project.
This project includes installation of a gravity sanitary sewer with a trenchless crossing beneath SR‑85 (Mountain View Corridor) within UDOT Region 2 right‑of‑way. The Work includes, but is not limited to, installation of 10-inch and 18‑inch PVC gravity sanitary sewer pipe; trenchless installation of a 36‑inch‑diameter steel casing with carrier pipe beneath Mountain View Corridor (State Route 85); excavation, construction, and backfilling of launch, retrieval, and intermediate shafts; installation of new 60‑inch‑diameter lined sanitary sewer manholes; connection to the existing sanitary sewer system; abandonment and removal of existing sewer infrastructure; surface restoration, including pavement, curb and gutter, sidewalk, and striping; traffic control within UDOT right‑of‑way; sanitary sewer bypass pumping as required; and all related appurtenances and incidental work necessary to complete the Project in accordance with the Contract Documents.
We post new plumbing opportunities in Utah as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Utah work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: State of Utah (Bonfire) (solicitation 254565), retrieved via the Utah Bonfire procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.