RFPQ FOR CAPITAL PROJECT ON A DESIGN-BUILD BASIS
Work at Cardinal Elementary includes replacement of select unit ventilators, air handling units, rooftop units and exhaust fans with related controls integration, and replacement and/or re-cover of 121,000 square feet of existing roofing. Services include programming and cost estimating, preliminary design and final working drawings and specifications, preparation and evaluation of publicly advertised trade bid packages, daily construction supervision, punch list and as-built drawings, commissioning, and post-construction training and follow-up with a minimum one-year warranty.
We post new general contractors opportunities in Michigan as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Michigan work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Michigan SIGMA VSS (solicitation RFP-OVS-270000000296-1), retrieved via the Michigan SIGMA Vendor Self Service portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.