Elevator Renovation
The scope includes: equipment removal and disposal of the existing elevator car and controls; furnishing and installing one new passenger elevator with car, doors, controller, motor/drive, safety devices, and fixtures; hoistway, pit, and machine room modifications; electrical disconnections and new wiring; installation of a non-proprietary elevator controller and safety devices; obtaining all permits and completing inspections and acceptance tests; factory-authorized start-up and commissioning; general conditions including labor, materials, and debris removal; and providing a minimum one-year workmanship warranty and manufacturer's equipment warranty.
We post new electrical opportunities in Michigan as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Michigan SIGMA VSS (solicitation RFP-NMP-270000000311-1), retrieved via the Michigan SIGMA Vendor Self Service portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.