THRIVE TRACK BID
The Contractor shall perform all Work and other construction work/services necessary at the School District in accordance with the respective Plans, Specifications and Minimum Compliance Requirements set forth in APPENDIX A. The work includes demolition of existing asphalt, concrete, and basketball hoops; installation of a 9-foot asphalt walking track, synthetic turf areas, poured-in-place rubber surfacing, concrete sidewalks and curbing, drainage systems (perforated draintile, storm pipe, catch basins), aggregate base courses, geotextile fabric, topsoil and seeding, landscaping (deciduous trees, lawn restoration), and installation of site amenities such as benches, tables, fitness equipment, basketball hoops, and signage. The project also includes grading, subdrainage, and all associated earthwork and site improvements as shown on the drawings and specifications.
We post new other opportunities in Michigan as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Michigan SIGMA VSS (solicitation RFP-LPS-270000000005-1), retrieved via the Michigan SIGMA Vendor Self Service portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.