Harbor Beach Renovation - Bid 2
The work includes three bid categories: Bid Category 10 (Resilient Flooring & Carpet) covering demolition, floor prep, and installation of resilient flooring, carpet, transition strips, and vinyl base; Bid Category 16 (HVAC) covering demolition, furnishing and installing HVAC equipment including boilers, roof top units, air handling units, pumps, temperature control systems, ductwork, piping, insulation, and air/water balance and testing; and Bid Category 18 (Plumbing) covering demolition, furnishing and installing a complete plumbing system including piping, fixtures, roof drains, floor drains, water meters, backflow preventers, and final sterilization of potable water systems.
We post new general contractors opportunities in Michigan as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Michigan SIGMA VSS (solicitation RFP-HBCS-270000000268-1), retrieved via the Michigan SIGMA Vendor Self Service portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.